Instruction 19-9326
5
Monoxor III
3.0 PREPARING THE ANALYZER
FOR OPERATION
To prepare a new analyzer for operaton, you must nstall four ‘AA’
Alkalne batteres, nstall the probe (f needed), and set the correct tme
and date as descrbed n the followng paragraphs.
For your convenence, and to ensure that the analyzer wll provde relable
CO readngs, the CO sensor was nstalled and the analyzer calbrated on
500 ppm CO at the factory.
3.1 Battery Installation
Install fresh batteries as described below. Check the analyzer for sufficient
charge prior to each use. Replace the batteries if the low-battery symbol
appears n the lower rght corner of the LCD. To nstall batteres:
1. Remove battery cover from back of unit (see Figure 3-1).
2. If old batteres are nstalled, remove and properly dspose of the
batteres.
3. Observng the polarty markngs nsde the battery compartment,
nstall four ‘AA’ Alkalne batteres.
4. Replace battery cover.
Figure 3-1. Battery Installation
��
���
���
�
��
���
���
�
��
���
���
�
��
���
���
�
� � � � � � � � � � � � � � � � � � � � � � �
� � � � � � � � � � � � � � � � � � � � �
� � � � � � � � � � � � � � � � � � � � � �
Summary of Contents for 19-8104
Page 4: ...Monoxor III Instruction 19 9326 ii Notes ...
Page 6: ...Instruction 19 9326 Monoxor III Notes ...
Page 8: ...Instruction 19 9326 Monoxor III Notes ...
Page 16: ...Instruction 19 9326 12 Monoxor III Notes ...
Page 22: ...Instruction 19 9326 18 Monoxor III Notes ...
Page 30: ...Instruction 19 9326 26 Monoxor III Figure 5 4 Back Case Component Locations ...
Page 34: ...Monoxor III Instruction 19 9326 30 Notes ...