DFCV Dry Cooler

DFCV-AD Adiabatic Cooler

RIGGING AND INSTALLATION INSTRUCTIONS

RDFCV-ADv15EN

Summary of Contents for TrilliumSeries DFCV Series

Page 1: ...DFCV Dry Cooler DFCV AD Adiabatic Cooler RIGGING AND INSTALLATION INSTRUCTIONS RDFCV ADv15EN...

Page 2: ...s and adjustments Start Up Every month Every 3 months Every 6 months Every start of adiabatic season Spring Adiabatic pre cooler water flow X X X Adiabatic controller set point X X X Tighten electrica...

Page 3: ...ng surfaces 7 Modifications by others 7 Warranty 7 2 Rigging 8 General notes 8 Rigging method 9 3 Section Assembly 11 Installation adiabatic pre cooler 11 Installation of screw on flanges 18 4 Optiona...

Page 4: ...f adiabatic pre cooler sections per model Model Number of fans Number of adiabatic pre cooler sections DFCV S9122 4 2 DFCV S9123 6 2 DFCV S9124 8 4 DFCV S9125 10 4 DFCV S9126 12 4 Number of fans and p...

Page 5: ...er support structure for bolting the unit to the support beams Leveling The unit must be level for proper operation and ease of piping The unit should be level to 0 5 mm m over the unit length and wid...

Page 6: ...y familiar with the equipment the associated systems and controls and the procedures set forth in this and other relevant manuals Proper care personal protective equipment procedures and tools must be...

Page 7: ...ss mean unless measures can be taken to mitigate any risks that might occur from doing so Modifications by others Whenever modifications or changes are made by others to the BAC equipment without writ...

Page 8: ...to use the lifting devices in conjunction with safety slings placed under the unit 4 For each unit only one lift is required Lifting ears are foreseen on each unit 5 Attach the lifting devices to the...

Page 9: ...lations will add substantially to the equipment s lifting weight Rigging method To avoid damage during hoisting a spreader beam should be used and the angles shown in the diagrams below must be observ...

Page 10: ...8 fan unit 10 fan unit 12 fan unit W W W B A L T I M O R E A I R C O I L E U 10...

Page 11: ...O R E A I R C O I L E U 11 SECTION ASSEMBLY Installation adiabatic pre cooler 1 REMOVAL OF CRATING Remove crating of pre cooling sections of the TrilliumSeries Coolers Crate with adiabatic pre cooling...

Page 12: ...laced inside the stainless steel frames for shipment and need to be removed before installation of the empty pre cooling frames on the dry cooler Remove the pre cooler media as follows Removal of top...

Page 13: ...ping between sections can be connected and the copper water piping installed on the unit connects to the water flow meter of the pre cooling sections Installation of empty pre cooler frame at dry unit...

Page 14: ...e Stainless steel bolts and nuts connecting pre cooler frame to dry unit flanges Water distribution piping of pre cooler sections interconnection Rubber sleeve used to connect with water distribution...

Page 15: ...connected with stainless steel connection plates 5 RE INSTALLATION OF THE PRE COOLER MEDIA Re install the pre cooler medium 2 and the water distribution pads 1 placed on top of the pre cooler medium R...

Page 16: ...he media and to ensure maximum efficiency The blue coloured side needs to be at the outside Continue with installation of pre cooler media Re installation of top plate 6 CONNECTION OF WATER INLET At w...

Page 17: ...on is equipped with a separate bottom drain guaranteeing full emptying and drying of the gutter system after each adiabatic cycle Refer to the table below for the number of adiabatic pre cooler sectio...

Page 18: ...for cleaning is given to the inside of the gutter system after removal of the pre cooling media For cleaning sequence see table About rigging and installation on page 2 Installation of screw on flang...

Page 19: ...Installing screw on flange W W W B A L T I M O R E A I R C O I L E U 19 3 Section Assembly 3 Section Assembly...

Page 20: ...W W W B A L T I M O R E A I R C O I L E U OPTIONAL ACCESSORIES ASSEMBLY All optional accessories are factory installed 20 DFCV DFCV AD 4 4 Optional Accessories Assembly 4 Optional Accessories Assembly...

Page 21: ...are the result of malfunctioning of mechanical components or operational problems e g unwanted ice formation If this occurs a thorough inspection of the entire unit followed by immediate corrective ac...

Page 22: ...l technician and must comply with local regulations The equipment is standard provided with a door interlocked main power switch Q0 which is factory fitted Connect electrical power to the power switch...

Page 23: ...PP Ambient air sensor AS1 AS2 Fluid temperature sensor TH Electrical panel Ventilation thermostat MF Electrical panel ventilator Q1 Q2 Q3 etc Thermal overload relay QBO Power inverter by pass switch C...

Page 24: ...te the solenoid valves DVW in position A automatic operation and press Auto Start on the inverter s LCP Makesure that all the necessary temperature probes are properly installed and wired For detailed...

Page 25: ...f 2002 30p Guide des Bonnes Pratiques Legionella et Tours A ror frig rantes Minist res de l Emploi et de la Solidarit Minist re de l Economie des Finances et de l Industrie Minist re de l Environnemen...

Page 26: ...W W W B A L T I M O R E A I R C O I L E U 26...

Page 27: ...W W W B A L T I M O R E A I R C O I L E U...

Page 28: ...W W W B A L T I M O R E A I R C O I L E U...

Page 29: ...W W W B A L T I M O R E A I R C O I L E U...

Page 30: ...W W W B A L T I M O R E A I R C O I L E U...

Page 31: ...W W W B A L T I M O R E A I R C O I L E U...

Page 32: ...AGE EVAPORATIVE CONDENSERS HYBRID PRODUCTS PARTS EQUIPMENTS SERVICES www BaltimoreAircoil eu info BaltimoreAircoil eu Please refer to our website for local contact details Industriepark Zone A B 2220...