B-K lighting BKSSL Precision2 DR2 Series Installation Instructions Download Page 2

RELEASE DATE

12-9-16

REFERENCE

 

NUMBER

INS-2179-00

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900 

www.bklighting.com • [email protected]

B-K LIGHTING

Threaded Entry

Side Flats

1.  Connect branch conduit connectors (By Others) 

to the junction box using either the threaded 

conduit entries on the bottom of the junction 

box or through holes drilled into the sides of the 

junction box. 

2.  Place housing in hole. Align junction box in the 

path of the conduit trench.

3.   Align holes to final installation orientation. Point 

arrows on temporary cover toward surface to 

be illuminated. 

 

 NOTE: Do not remove temporary cover until 

installation of faceplate.

Flush with finished grade

5.    Raise housing on EMT so housing is flush with 

finished grade. Use a level to aid in leveling 

housing. 

6.  When housing is level, tighten screws on 

Patented Stability Flange™ to secure housing to 

EMT. Remove excess EMT as needed.

8.  Per DIG-IT Guide, backfill the gap between the 

bottom of housing and bottom of hole with 

sand for drainage.

Housing

9.   Fill and tamp soil to the appropriate height 

leaving room for sod, pavers, etc. to be level 

with the top of the temporary cover.

10.  Pull secondary wiring from remote transformer 

to installed housing(s).

7.  Connect the conduit to the conduit connectors. 

4.  Insert (4) pieces of ½” EMT conduit through 

the Patented Stability Flange™. Hammer into 

substrate  until secure.

 Leave sufficient clearance to elevate housing 

to finished grade.

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

PROJECT:

TYPE:

DR

2

 SERIES

Deep Housing - Solid State LED

Remote Transformer Installation Instructions

Reviews: