14. Wiring diagrams with Power
pack PP-A-J and PP-1-J
Standard mode with Primary/Secondary
!
Secondary sensors and primary sensor must be
connected to the same power pack.
!
Secondary sensors and primary sensor must be
connected to the same power pack.
B.E.G.
Controls
277 Highway 74 N, Suite 319
Peachtree City, GA 30269
Phone: 770-349-6341
Email: [email protected]
MAN 8
88
7-18
0316_1
Controls
B.E.G.
Hot
White
Black
Neutral
Brown
Orange
Gray
Red
Y / B
Y
Y / R
HVAC
Load
PB
PB PB
Power Pack
Switch
PP-A-J
LED Switch
RJ 12
RJ 12
RJ 12
6
S
Secondary
P
Primary
All Off
HVAC Load
Red
Red
120 - 277 VAC
24 VDC
max. 200 mA
RJ12 male
to dual
RJ12
female
splitter
Hot
White
Black
Neutral
Gray
Red
Load
PB
Power Pack
Switch
PP-1-J
LED Switch
RJ 12
RJ 12
RJ 12
6
S
Secondary
P
Primary
Load
Red
Red
120 - 277 VAC
24 VDC
max. 200 mA
RJ12 male
to dual
RJ12
female
splitter