Installation and Operating Instruction for B.E.G. - Occupancy detector PD2-M-DALI/DSI-SM/FC
LUXOMAT
®
PD2-M-DALI/DSI
DE
2. Operation
The presence detector controls the light automatically according
to people present (movements) and the ambient brightness.
The integrated light sensor constantly measures the ambient
light and compares it with the set value brightness on the
detector.
If the ambient light is sufficient, lighting will not be switched.
If the ambient light level is below the set value brightness, a
movement activates the lighting in the room.
The detector switches the light off despite of a person being
present if there is enough natural light for 5 min or if no move-
ment is detected for one follow-up time.
3. Safety information
A circular opening of diameter
68 mm must be produced in the
ceiling. Having connected up the
cables in accordance with regula-
tions, the detector is inserted into
the opening and fixed into position
with the assistance of the spring
clips (see figure 2).
4b. Mounting FC
68 mm
68 mm
5a. Position DIP switches, LEDs and
Potentiometers SM
5b. Position DIP switches, LEDs and Poten-
tiometer FC
1. Product information
·
Occupancy detector for daylight-dependent lighting control
·
DALI / DSI interface for controlling digitally dimmable
electronic ballasts as a group
·
Switching between DSI and DALI program by remote
control or DIP switch
·
Extension of the detection area by slave devices is possible
·
Other functions adjustable by remote control (optional)
·
Manual switching and dimming via pushbutton possible
·
Orientation light function
Work on the 110-240 V mains supply may only
be carried out by qualified professionals or by
instructed persons under the direction and super-
vision of qualified skilled electrical personnel in
accordance with electrotechnical regulations.
Disconnect supply before installing!
This device is not suitable for disconnection.
Mounting the cover ring after introduction of the
power cable (FC version).
!
!
!
The product enters an initial 60-second self-test cycle, when the
supply is first connected. During this time the device does not
respond to movement and stays on.
6. Self test cycle/Startup behavior
7. Putting into operation/Settings
Brightness set value for constant light control
(Potentiometer A)
The brightness set value can be defined between
10 and 2000 Lux. The potentiometer enables a free
selection of the brightness value.
Symbol
: Night-time operation
Symbol
: Daytime operation
(light evaluation inactive)
Follow-up time “Light” (Potentiometer B)
The follow-up time can be set to 1 to 30 minutes.
Symbol
TE
: test mode
Irrespective of the brightness, every movement
switches the light on for 1sec., then off again for
2 sec.
Follow-up time orientation light (Potentiometer C)
Manually switching the orientation light on/off.
“ON” for permanent orientation light OFF” for
switching off the orientation light
TIME
TE
1
3
6
22
18 16
10
30
25
LUX
40
2000
600
1200
200
20%
60
5
10
50 30
O
FF
O
N
9s
2s
LED ON
LED OFF
TIME
TE
1
3
6
22
18 16
10
30
25
LUX
40
2000
600
1200
200
20%
60
5
10
50 30
O
FF
O
N
9s
2s
LED ON
LED OFF
TIME
TE
1
3
6
22
18 16
10
30
25
LUX
40
2000
600
1200
200
20%
60
5
10
50 30
O
FF
O
N
9s
2s
LED ON
LED OFF
8. Wiring diagram
9. Manual switching and dimming (see section 23)
By pressing the push button, the phase can be given to the S
terminal.
To turn on or off the light, press the push button briefly. The light
will remain on or off, as long as people are detected plus the
follow-up time.
With a long press of the push button the light will be dimmed
manually. When releasing the button, the current brightness
value is retained.
With renewed long press of the push button, the dimming
direction is reversed.
Standard mode with Master/Slave device(s)
Connected Slave devices must have the same phase as the
Master device.
!
Figure 2
!
!
The light sensor must be positioned facing away from
the window.
In master/slave mode, the master device must al-
ways be installed at the location with least daylight.
EN
L
N
E1
DALI /DSI
L
N
DA
DA
L
N
R
S
+
-
DA1
N
L
R
T1
Master
device
Slav
e
device
!
4. Mounting
4a. Mounting SM
The detector has to be mounted on
a plane and solid surface. Before
mounting, cover ring has to be
removed. To do so, twist the cover
ring anticlockwise through approx. 5°
and lift off.
Having connected up the cables in
accordance with regulations, put
on the cover ring by turning in a
clockwise direction (see fig. 1). Apply
mains voltage.
Figure 1
close
open
Schematic diagram - when connecting the detector, please res-
pect the labelling of the terminal connections at the detector!
DIP switch functions
DIP 1
Full automatic mode
(VA)
Semi-automatic mode
(HA)
DIP 2
LED ON
LED OFF
DIP 3
Operation mode DALI
Operation mode DSI
LED I
green
LED II
red
LED III
white
Potentiometer A
Brightness set value (constant light control)
Potentiometer B
Follow-up time light
Potentiometer C
Follow-up time (orientation light)
C
B
A
PD2 Surface
mounting
Light
measurement
DIP
LED
OFF
DSI
DALI
VA
HA
LED
ON
1
I
II
III
2
3
I
II III
PD2
False ceiling
mounting
C
B
A
Light
measurement
DALI_D
SI
LED ON_ LED OFF
VA_HA
1
2
3
DIP
10. Range
11. Exclude sources of interference
SM
FC
If the detection zone is too large, or areas are covered that should not
be monitored, use the blinds to reduce or limit those areas.
·
Walking across
·
Walking towards
·
Smaller movements / Seated
2
1
1 79m
�
2 28m
�
3 13m
�
3
10m
6m
4m
2,50m