
Azbil Corporation
Installation
Model JTD720A - Smart Multivariable Transmitter 2-15
2-4 : Changing process connection port position
2-4-1 : Changing the vertical position of the process
connection port
Introduction
When this device was shipped, the process connection port was positioned on the
center body cover as specified in your order. The up/down position can be changed.
This section describes how to change the position of the process connection port from
the bottom of this device to the top.
Adapter flange
Figure 2-14 Changing process connection port position
Procedure
1. Remove the four bolts that hold the two adapter flanges.
2. Remove the two vent/drain plugs.
3. Attach the two adapter flanges to the top of this device with bolts. Tighten the
bolts to the specified torque.
Specified torque:
SNB 7, SUS 630
20±1 N·
m
SUS 304
10±0.5 N·m
4. Apply seal tape around the threads of the two vent/drain plugs and spray
lubricant.
5. Screw the vent/drain plugs into the bottom of this device. Tighten the plugs
to the specified torque 5 ± 0.3 N
·
m.
Use the same procedure (making the necessary changes) when moving the connection
port from the top to the bottom.
Summary of Contents for JTD720A
Page 1: ...CM2 DST720 2001 Smart Multivariable Transmitter Model JTD720A User s Manual...
Page 34: ...Installation Azbil Corporation 2 16 Model JTD720A Smart Multivariable Transmitter...
Page 70: ...Azbil Corporation 4 20 Model JTD720A Smart Multivariable Transmitter...
Page 71: ......
Page 74: ......
Page 76: ......