Operation instructions | HKM 40-0x
6
2018-10-05 | Technical improvements, changes in design, printing- and other errors expected.
2. Mounting and Installation
Installation must be performed by authorized and skilled electricians only.
Before mounting and installation, pull the mains plug (1)!
The HKM 40-0x can be mounted on either at the wall or be mounted in a 19 "rack.
2.1.
Wall mounting
The HKM 40-0x are factory-fitted with wall brackets.
Note:
The unit must be wall mounted with at least 5 cm clearance along the 4 sides.
The installation must be carried out on an even and vertical surface (any unevenness must be
compensated).
Fix the HKM 40-0x with with minimum four pcs of 4 × 30 mm screws.
The HKM 40-0x must be connected to the equipotential bonding according to EN 60728-11. Use the
equipotential bonding connection attached to the device (3).