
Jet Cleaner TANKO-JM
54/90
Translation of the original Operating / Installation Instructions 2016/12
7 Maintenance
7.4.1.1
JM100 Maintenance Intervals
Maintenance points
A Media connection [MC] /
Process connection [PC]
B Plain bearing on rotor shaft
C Housing / bevel gear wheel connection
D Nozzle carrier / nozzles connection
E Plain bearing on axis for nozzle carrier
Figure 7.4-1: JM100 maintenance points
The tightening torque values for the thread connections required for maintenance are listed in
section 7.5.1 JM100 Spare Parts
P
oint
Inspection and Maintenance Work
Int
e
rv
a
l
M
eth
od
A
The fluid and process connection is implemented using a threaded connection.
Vibrations from operation could under certain circumstances cause the connection to
become loose. You must therefore regularly check to see if they are firmly in place.
m
S, F
B
Check plain bearing to make sure it is fully functional and for wear.
Clean or replace the plain bearing washers as necessary.
200 h
O
S, F, R
C
The housing/bevel gear wheel connection is implemented via a threaded connection.
Check the secure placement and functionality of the bevel gear wheel (rotation) and the
wear on the teeth.
m
S, F
D
Check the nozzle carrier / nozzles connection to make sure that it is securely in place.
m
S, F
E
Check the ball bearings to make sure they are fully functional and for wear.
Clean or replace the balls as necessary.
200 h
O
S, F, R
Table 7.4-1: JM100 inspection and maintenance work