Latest products and information available at www.avlite.com
29
AV-426-ICAO
Radio Controlled Solar Aviation Light
Levelling the light
During Installation every effort should be made to ensure that the light is level when installation is
complete.
The following guide lines will help to ensure that the lights will be installed correctly.
- When installing a stake mount into the ground ensure that the stake is installed straight into the
ground and not on an angle.
- When installing a concrete mount plate ensure that the concrete pad is level using a spirit level.
- Fit the frangible coupling and top mounting plate and using a spirit level check that the light
mounting plate is level using a spirit level.
- If the mounting assembly can not be levelled to a satisfactory plane, then spacers can be used
under the 4 mounting points to complete levelling.
- Spacers must be secured. Flat penny Washers can be placed under the 4 mounting points and
secured in place by the mounting bolts.
- Washers of different thicknesses can be used, as can multiple washers.
Incorrect
Installation
Correct
Installation
Important:
Please ensure that spacers are not just under one mounting point. Please fill in spacers
under other mounting points. Failure to space gaps will result in damage to the base or the mounting
plate.
Check the mounting
plate with a spirit
level in all directions
One spacer fitted here
either side of the two
washers
Two spacer fitted here