Rack-Mounting the Equipment
52
Make sure your rack enclosure is stable enough to prevent tipping over when one or more
Avid ISIS servers are extended on the sliding rails.
•
Circuit Overloading — Consideration should be given to the connection of the equipment to
the supply circuit and the effect that overloading of the circuits might have on overcurrent
protection and supply wiring. Appropriate consideration of equipment nameplate ratings
should be used when addressing this concern.
•
Reliable Grounding — Reliable grounding of rack-mounted equipment should be
maintained. Particular attention should be given to supply connections other than direct
connections to the branch circuit (for example, use of power strips).
•
Inside Enclosure Access — If you want to extend the enclosure, and remove the top cover,
you must allow 0.5 in (1.3 cm) clearance on top of the enclosure for cover removal.
Positioning the server in the Rack
The following information helps you decide where to install the System Director in the rack.
To position the System Director in the rack enclosure:
t
Select a position in the rack where the System Director is at the proper baseline position.
Positioning the System Director
5/8 in
5/8 in
1/2 in
5/8 in
5/8 in
1/2 in
5/8 in
5/8 in
1/2 in
5/8 in
5/8 in
1/2 in
1U
2U
3U
1 3/4 in
1 3/4 in
1 3/4 in
B
as
eline po
s
ition i
s
b
etween
two 1/2inch hole
s
.
R
a
ck mo
u
nting r
a
il
hole
s
p
a
cing
EIA r
a
ck
u
nit
R
a
ck mo
u
nting r
a
il
Sy
s
tem Director
front p
a
nel mo
u
nting hole