Ceiling, wall, floor or surface must be hard, flat and level.
Please also check the local atmosphere: the humidity
in the room should not exceed 65% rel. Particularly, the
structure in new attic buildings should be checked prior to
installation with the installer.
The ambient temperature and the operating temperature
must not exceed 40°C. The air temperatures inside and
in the production plants must be respected and cannot
exceed 45°C. The ventilation unit is not suitable for use
in technological processes where explosive or aggressive
substances are contained in the air flow. Failure to follow
the instructions will void any warranty for the correct
operation of the equipment, as well as the manufacturer's
liability.
The unit must be positioned leveled: this is important to
drain the condensate. Remember the condensate ducting
with the siphon.
Check the unit air flow layout and installation: it is not
possible to change the ordered layout in site and specific
user requirements are to be factory fitted with dedicated
customization.
VERY IMPORTANT: The unit can be mounted to the
ceiling using the two holes in the bracket. Make sure that
the backside panel is airtight. See the table with weight
and dimensions for each size. The supporting rods must
be sized to carry at least 2 times the weight.
CEILING VOID
Free space for
service and
operation
Free space for service and operation