
Chapter 5: Preparing for installation
Introduction
This chapter presents the recommended placement, installation options, and preparations required
for proper physical installation of the equipment chassis.
Note:
Throughout this document, when referring to Avaya SBCE devices, the terms
Primary
and
Secondary
are used interchangeably with the terms
Active
and
Stand-by
, respectively.
Important:
If Release Notes shipped with your equipment chassis has different information, then follow the
Release Notes.
Note:
The requirements described in this document are intended for system administrators, network
managers, or other qualified network equipment technicians and maintenance personnel. A
working knowledge of general communications equipment protocols and network security
requirements is necessary. Installation, maintenance, and removal of the Avaya SBCE 1U
equipment chassis must be done only by qualified service personnel.
Important:
The Avaya SBCE 1U equipment chassis does not contain user-serviceable subsystems or
components. Opening the chassis voids the product warranty.
Hardware safety
The following general safety precautions must be observed during all phases of operation, service,
and repair of this equipment. Failure to comply with these precautions or with specific warnings
elsewhere in this manual could result in personal injury, network outage, or damage to the
equipment.
The following safety precautions listed below represent warnings of certain dangers of which Avaya
is aware. As the user of the product, you must follow these warnings and all other safety precautions
necessary for the safe operation of the equipment in your operating environment.
38
Deploying Avaya SBCE
August 2015