Connecting the media gateway to the main distribution frame
Installing the Avaya S8700 Media Server with an Avaya G650 Media Gateway
149
December 2003
Connecting the media gateway to the main distribution
frame
Once the main distribution frame (MDF) is installed and wired, you must connect the media gateways to
the MDF.
Run excess cables on an upper cable ladder (if the MDF connectors are on top) or route them through a
cable slack manager that is placed next to the MDF. For more information, see
Installing Cable Slack
Managers
on page 147.
This section has information about
•
Equipment room cabling labels
on page 149
•
Cable routing guidelines
on page 151
•
Trunk cables among network interface, sneak fuse panel, and media gateway
on page 153
And procedures for:
•
Installing cables between media gateway and main distribution frame
on page 153
•
Installing connector cables between auxiliary cabinet (if used) and main distribution frame
on
page 154
Equipment room cabling labels
The purple port label shown in
Figure 52, Equipment room cabling labels,
on page 149 is installed on
both ends of the 25-pair cables connecting to the trunk/auxiliary field and/or distribution field.
Figure 52: Equipment room cabling labels
Figure notes
1
Purple Label (Port Cable)
2
Blue/Yellow Label (Building and
Floor)
3
Yellow Label (Auxiliary)
4
Blue/Yellow Label (Site or
Satellite)
labels LJK 060396
1 A 2
A