Installing the Avaya™ S8700 Media Server with Avaya™ MCC1 or SCC1 Media Gateway
May 2003
Install and Administer the Patch Cord/Jumper
Before starting the patch cord installation, obtain a copy of the Port Assignment Record forms
from the customer or marketing representative. See
‘‘Port Assignment Record Form’’ on page
The white label identifying the terminal block row associated with circuits 17 to 24 connects to
an identically labeled terminal block row at the satellite closet. See
to Information Outlet’’ on page 144
. This is always the case for either 1-point or 2-point
administration.
The satellite symbol must be installed at all connection points between the blue field and the
information outlet. It must also be installed at the information outlet itself.
‘‘Example 4-Pair Labeling to Information Outlet’’ on page 145
shows an example labeling
scheme for 4-pair circuits from the equipment room to the information outlets. The labeling
scheme for 3-pair circuits from the MDF to a satellite location.