
INSTALLATION
Avaya 9130 EBM Site Preparation, Installation and Operator’s Manual
S
164201770 Rev 1
17
Installation
The Avaya 9130 rackmount cabinet comes with all hardware required for
installation in a standard EIA or JIS seismic rackmount configuration with
square and round mounting holes. The rail assemblies adjust to mount in
48-cm (19-inch) racks with front to rear rail distances from 61 to 76 cm
(24 to 30 inches) deep.
Checking the Rail Kit Accessories
Verify that the following rail kit items are included for each cabinet:
S
Left rail assembly:
-
Left rail
-
Rear rail
-
(3) M4
×
8 pan-head screws
S
Right rail assembly:
-
Right rail
-
Rear rail
-
(3) M4
×
8 pan-head screws
S
Rail hardware kit:
-
(10) M6
×
16 pan-head screws
-
(10) M6 cage nuts
-
(2) rear stop brackets
-
(2) M3
×
8 pan-head screws
S
Mounting bracket kit:
-
(2) mounting brackets
-
(8) M4
×
8 flat-head screws
Tools Required
To assemble the components, the following tools may be needed:
S
Medium flat-bladed screwdriver
S
Phillips
®
#2 screwdriver
S
7 and 8 mm wrench or socket
Summary of Contents for 9130 EBM
Page 47: ......
Page 48: ...1642017701 164201770 1...