LM 706 A/C Service Station
9
Follow the prompts step by step.
Note: 15kg weight is needed in the calibration process (or for the object with known accurate weight, the reference
weight can be in the range of 10-20kg).
b)
Calibration of oil-bottle load cell
Follow the prompts step by step.
Note: 2kg weight is needed in the calibration process (or for the object with known accurate weight, the reference weight
can be in the range of 1-3kg).
Note: if unsuccessful steps appear in the calibration process, please refer to the prompt information for inspection.
3.11.2.3
Refrigerant supply
A
、
When the amount of refrigerant of the equipment is less than 2kg, it need to be
supplemented. If the refrigerant is less than 1kg, the filling function will not be performed.
B
、
Operations:
B-1: Select Supply main tank function.
B-2: Choose whether to use supply adaptor or not.
B-2-1: If use the adaptor, the pipeline connection is as follows:
Connect the adaptor to the port of fresh refrigerant tank.
Connect the coupler to the supply adaptor and open it.
B-2-2: If
don’t use
the adaptor, the pipeline connection is as follows:
Connect blue pipe to the port of fresh refrigerant tank.
B-3: Open the valve of fresh refrigerant tank.
B-4: Set the amount of supplying and press OK to run.
B-5: When the equipment prompts to close the valve of the external tank, please close it in
time, put the refrigerant tank upright, and press enter to confirm.