background image

CLK-2

1-800-633-0405

CLICK Module Insert

www.automationdirect.com/click-plc

3505 HUTCHINSON ROAD 

CUMMING, GA 30040-5860

C0-08TR-3  CLICK Expansion I/O Module 

Copyright© 2020, 

Automationdirect.com

 Incorporated/All Rights Reserved Worldwide

Installation and Mounting

Safety Installation

Please heed the following instructions when 
installing:

•  Mount the CLICK PLC unit horizontally to provide 

proper ventilation.

•  Do not mount the CLICK PLC unit upside down, on 

a horizontal surface, or in a vertical arrangement.

•  There is a minimum clearance requirement of 2in. 

(51mm) from all sides of the cabinet and the equipment.

•  There is a minimum clearance requirement of 3in. 

(76mm) from the wiring ducts and the equipment.

•  Please use this product in a metal enclosure/cabinet.

Installing Expansion I/O Modules:

• Remove protective cover over buss port. 

• Push the LOCK slide (top and bottom of modules) to “UNLOCK”.
• Align module pins and tabs (attachment of modules) into adjacent 

slots and firmly push together.

• Push the LOCK slides to “LOCK” to lock modules rigidly together. 

Additional Help and Support

• For additional technical support and questions, call our 

Technical Support team @ 1-800-633-0405 or 770-844-4200

Air

Flow

TX

2

PORT

2

PORT

1

RX

2

RX

1

TX

1

PWR

ER

R

RU

N

ST

OP

RU

N

To remove an I/O module, first disconnect all phases of external 
power source and wait 

5 seconds

 before installing or removing the 

expansion I/O module of a functioning system.
Then push LOCK slides to “UNLOCK” and gently separate modules.

1.  Safety Installation, Wiring or Handling

•   Discharge static electricity before installation or wir-

ing in order to avoid electric equipment damage.

2.  Preface

•   CLICK C0-08TR-3 is supported by CLICK Programming software Ver 2.60 

or higher.

3.  Compliant Crimp-type terminal

•   I/O terminals

4.  The following crimping ferrules are recommended for 24VDC 

terminal and I/O terminals of CPU and Expansion I/O.

5.  Safety Standard
•  To comply with safety standards, please observe and use the following: 

Please use SELV (as defined by UL61010-2-201) and Limited Energy (as 
defined by UL61010-1, 9.4)
Please ensure basic insulation is provided between each relay block.
In order to comply with IEC/UL 61010-2-201 if the output is connected 
to a circuit lower than 30V, please provide an external isolation before 
the relay output terminals. Basic isolation requires an air separation of at 
least 1.5 mm, a creepage distance of at least 2.5 mm, and a withstand 
voltage of 1500V rms.

Enclosures

It is important to select the appropriate enclosure to ensure safe and proper oper-
ation of your CLICK PLC system.  Control applications vary and yours may require 
additional considerations.  At a minimum your enclosure should include:

•  Conformance to electrical standards
•  Protection from the elements in an industrial environment
•  Common ground reference
•  Maintenance of specified ambient temperature
•  Access to equipment
•  Security or restricted access
•  Sufficient space for proper installation and maintenance of equipment

CAUTION

•  When installing modules and CPU on DIN rails, always 

use end brackets on both ends of assembly.

•  You should use 35mm width DIN Rails.
•  You should use M4 size screws when you surface mount.
•  You should tighten the screws with a spring washer and 

a small round washer and torque (0.5 to 0.6 N·m).

CAUTION

Do not operate without first installing safety cover over power supply 

leads.

Company

Series

Model No.

Compliant Wire

Fröhlich

Twin Ferrules

V30AE001134

 * 0.5 mm

2

  

  (20 AWG)

* Rated torque is 0.5 N·m.  Take care not to contact adjacent terminal. 

51mm

Minimum clearance requirement 

of 51mm for A, B, and C. 

1

2

3

Locking Tabs (Top and Bottom)

OPEN

CLOSED

Modules easily connect to each other.

Reviews: