Chapter 5 - System Setup Screens
5-32
®
1
2
3
4
5
6
7
8
9
10
11
12
13
14
A
B
C
D
EA9-USER-M Hardware User Manual, 1st Ed. Rev. K
Test Menu – PLC Enquiry Test: Ethernet Connection
This function allows the ability to select any PLC
configured in the project that may be connected to the
touch panel through an Ethernet port connection and
checks to see if the communications are working
correctly.
NOTE:
The communications protocol for the PLC
being selected must be configured the same as the
C-more
touch panel. The touch panel’s PLC serial
communications are configured using the
C-more
Programming Software’s Panel Manager.
PLC Enquiry Test
Following are the steps that the Ethernet PLC Enquiry Test performs:
1.) Ping the network 4 times for the PLC selected.
2.) Four of the test read packets are sent to the selected PLC.
The test result will either be Pass or Fail. However, if the result of pinging the network shows
an error, the test is stopped.
1
2
3
Summary of Contents for C-more EA9-T10CL
Page 2: ...Hardware User Manual EA9 USER M...
Page 3: ......
Page 7: ......
Page 9: ......
Page 17: ......
Page 36: ...This page intentionally left blank...
Page 77: ......
Page 91: ......