Checklist: Site Preparation Work
Check that the following has been done prior to installing the Security Entrance
Lane.
Floor level and quality has been corrected
Holes have been drilled
Holes have been cleaned
Conduits and cables have been installed:
Conduit 1 installed
120 VAC single phase, 60 Hz power cable
Conduit 2 installed
Control cables for the access control reader and lane door output
Conduit 3 installed
Master/Slave Motor: High voltage interconnection cable
Conduit 4 installed
Master/Slave: Low voltage interconnection cable
Internal CAN Network cable
Network cable for remote control lane (optional)