%H
Hour in 24-hour format (00 - 23).
%I
Hour in 12-hour format (01 - 12).
%j
Day of year as decimal number (001 - 366).
%m
Month as decimal number (01 - 12).
%M
Minute as decimal number (00 - 59).
%p
Current locale's A.M./P.M. indicator for 12-hour clock.
%S
Second as decimal number (00 - 59).
%U
Week of year as decimal number, with Sunday as first day of week (00 - 53).
%w
Weekday as decimal number (0 - 6; Sunday is 0).
%W
Week of year as decimal number, with Monday as first day of week (00 - 53).
%x
Date representation for current locale.
%X
Time representation for current locale.
%y
Year without century, as decimal number (00 - 99).
%Y
Year with century, as decimal number.
%z
Time-zone abbreviation; no characters if time zone is unknown.
%Z
Time-zone name; no characters if time zone is unknown.
Color Keywords
$COLOR_RED
Sets the overlay display text color to be red.
$COLOR_BLUE
Sets the overlay display text color to be blue.
$COLOR_GREEN
Sets the overlay display text color to be green.
$COLOR_WHITE
Sets the overlay display text color to be white.
$COLOR_BLACK
Sets the overlay display text color to be black.
$RGBr,g,b$RGB
Sets the overlay display text to any color specified using explicit rgb values between 0 and 255.
For example, $RGB127,127,127$RGB sets the color to grey.
Extra Keywords
$TASKS
Adds the name of each currently active task to the overlay display text. Each task is displayed on a new
line.
$DAY
Days since start of first task in project (starting from 1).
$WEEK
Weeks since start of first task in project (starting from 1).
Ctrl+Enter
Type Ctrl+Enter to insert a new line into the overlay display text.
%%
Percent sign.
Get Started
To get started
1
Load a model into Autodesk Navisworks in the usual way (see “
” on page 117 for more information),
and then click Tools
➤
TimeLiner.
NOTE
Although the ability to create 4D simulations is limited to users with access to the TimeLiner functionality,
any user can actually play 4D simulations back once they have been set up.
350 | Chapter 15 Simulate Construction Scheduling
Summary of Contents for 507B1-90A211-1301 - NavisWorks Manage 2010
Page 1: ...Autodesk Navisworks Manage 2010 User Guide March 2009 ...
Page 12: ...xii Contents ...
Page 14: ...2 Part 1 Welcome to Autodesk Navisworks Manage 2010 ...
Page 64: ...52 Chapter 3 Installation ...
Page 97: ...Get a Whole Project View 85 ...
Page 98: ...86 Part 2 Get a Whole Project View ...
Page 136: ...124 Chapter 5 Work with Files ...
Page 178: ...To toggle ViewCube Click View Head Up Display ViewCube 166 Chapter 6 Explore Your Model ...
Page 262: ...250 Chapter 9 Use Viewpoints and Sectioning Modes ...
Page 270: ...258 Chapter 11 Work Within a Team ...
Page 282: ...270 Chapter 12 Share Data ...
Page 346: ...334 Chapter 14 Create Photorealistic Visualizations ...
Page 460: ...448 Chapter 17 Autodesk Navisworks Reference ...
Page 466: ...454 Glossary ...