Page 26 (44)
Overspeed test
This section describes how to enter the RPM Test mode. In test mode,
the Overspeed Setpoint (typically 1725 rpm) is reduced to Nominal
Setpoint (typically 1500 rpm).
Note:
The actual setpoints may vary from the above example. Consult
the Rudolf configuration.
How to enable the RPM test mode
Follow these steps to enable the RPM Test mode:
Access the menu and select
Overspeed/RPM Test
.
Note
! It is not possible to enable the RPM Test mode unless the
control unit is in the
Ready
state.
The Overspeed Setpoint is now reduced to the Nominal Setpoint. The
bottom left status field displays “RPM TEST” to indicate and remind
of this.
Note:
The test automatically times out after 4 minutes or after an
Overspeed shutdown. To leave the test earlier, toggle it again, as
described above.
Summary of Contents for DCU 305 R3 LT
Page 1: ...Auto Maskin Installation Manual DCU 305 R3 DCU 305 R3 LT Diesel Engine Control Unit...
Page 2: ...About this manual ii...
Page 35: ...Page 35 44 Schematic Drawings Sample Schematic Page 1...
Page 36: ...Page 36 44 Sample Schematic Page 2...
Page 37: ...Page 37 44 Optional Relay Unit MK 14...