Copyright © 2006-2011 AudioNote Kits
www.AudioNoteKits.com
Page 43
Section 4: M2 Power Supply Testing
Preparations
Fitting the Mains Fuse
In this section we are going to
electrically test the power supply.
Start by installing a 1A Slo Blo fuse
(IEC BAG) into position as shown.
Use a screwdriver or flat edge or your
fingers pull the Fuse holder out - you
will need to squeeze to completely
remove it.
Insert the fuse into the holder as
shown opposite.
With the fuse installed into the holder
insert back into the IEC plug.
With the Fuse installed we are ready
to do some testing!
READ the entire remaining section first
before taking any actions!