![ATX UCrypt IP2Q Quick Start Manual Download Page 15](http://html.mh-extra.com/html/atx/ucrypt-ip2q/ucrypt-ip2q_quick-start-manual_3006248015.webp)
MDU Solutions
®
– UCrypt
®
IP to QAM – Quick Start Guide
6-1
CHAPTER 6: POWERING UP
POWERING UP
6. POWERING UP
NOTE: The factory default confi guration is that all QAM outputs are disabled so no unintended
output into the distribution network is possible.
If the UCrypt has been pre-provisioned elsewhere, before powering the UCrypt, ensure that the network output cables are
disconnected from the distribution network to avoid unintentional service outages if there are overlaps between the QAM
output frequencies of the UCrypt and existing services on the network.
Apply power and turn on the rear panel switch below the power receptacle. Boot-up of the UCrypt will take approximately 90
seconds.