background image

ATTO FibreCenter™ 3400

Secure Data Path Application

Installation and Operation Manual

© 2002 ATTO Technology, Inc. All rights reserved. All brand or product names are trademarks of their respective 
holders. No part of this manual may be reproduced in any form or by any means without the express written 
permission of ATTO Technology, Inc.

5/02                                                                                   Document Control Number: PRMA-0320-000

Summary of Contents for FibreCenter 3400

Page 1: ...02 ATTO Technology Inc All rights reserved All brand or product names are trademarks of their respective holders No part of this manual may be reproduced in any form or by any means without the expres...

Page 2: ......

Page 3: ......

Page 4: ...emoving a power module 5 Setting up the ATTO FibreCenter 9 Installing the FibreCenter To change the password Connecting Fibre Channel ports Cabling Removing the FibreCenter 6 Configuring the ATTO Fibr...

Page 5: ...Reset Setup Switch Switch Delay 8 Updating firmware 19 Linux Kernel Update Flash File System FFS Update 9 Troubleshooting 20 Index Command Line Interface i Appendix A Standards and compliances iii Ap...

Page 6: ...olerance and load balancing by supporting server clustering and failover the ability for one server to take over for another in the event of a failure The ATTO FibreCenter 3400 hub integrates industry...

Page 7: ...n NL port A port that connects a node in Fibre Channel arbitrated loop POST Power On Systems Test a series of self diagnostic tests stored in RAM which run when power is first applied to a component s...

Page 8: ...et cable 5 Connect Fibre Channel devices to the ATTO FibreCenter using SFPs and standard cables manufactured for Fibre Channel use 6 Connect a host computer to the FibreCenter 3400 The default IP addr...

Page 9: ...speed 1 Gigabit or 2 Gigabit Ports 2 3 and 4 may access port 1 but only one at a time under control of the Command Line Interface Setup and Switch commands Ports 6 7 and 8 may access port 5 but only o...

Page 10: ...ions Eight 2 Gigabit Fibre Channel ports with Small Formfactor Pluggable SFP interface 400 MB sec maximum throughput in full duplex mode per zone Auto negotiation between 2 Gigabit and 1 Gigabit modes...

Page 11: ...Secure Data Path Applicationv 6 Exhibit 3 1 Front view of the FibreCenter 3400 Exhibit 3 2 Module view of the FibreCenter 3400...

Page 12: ...dules installed will have a total of 32 CFM of airflow Air enters through the sides of the enclosure and is exhausted out the power modules Ambient air near the inlets should not exceed 40 C WARNING D...

Page 13: ...the world Installing a power module 1 Make sure the power switch on the rear of the power module is in the off position and the power cord is disconnected 2 Slide the power module into the rack enclo...

Page 14: ...bre Channel devices to the ATTO FibreCenter using SFPs and standard cables manufactured for Fibre Channel use Cable limitations are listed in the chart on the next page The Online LED illuminates for...

Page 15: ...at only one port of the FibreCenter 3400 or multiple hubs daisy chained together are connected to the switch Youmay not connect ports frommultipleswitches to the same loop FibreCenter 3400 Cabling Fib...

Page 16: ...d return ports are labeled with letters Zone 2 and Zone 3 do not overlap Within a zone all ports are disabled except the lowest numbered port counting from the left and the single other port to which...

Page 17: ...Switch commands Each zone is independent of the other and so may be configured to run at different or the same speeds 1 Gigabit or 2 Gigabit Ports 2 3 and 4 may access port 1 but only one at a time Po...

Page 18: ...connections are assumed to be between port 1 and 2 3 4 5 6 7 8 in zone 1 between port 1 and 2 3 4 in zone 2 and between port 5 and 6 7 8 in zone 3 In the Get Switch command return ports are labeled wi...

Page 19: ...resent RACK 000 or 000 required parameters LL Hub zone 01 02 03 C Channel or port number such as 2 3 4 5 6 7 8 in single zone Zone 1 configuration Exhibit 7 4 A typical command response sequence durin...

Page 20: ...efaults Information none reset rack 000 or power cycle Idle Timeout Sets time period in seconds after which if there is no action on the Telnet port the Telnet session is shut down Default 60 minutes...

Page 21: ...none Information get Status 000 Return syntax Status 000 PS1 PP FAN1 FF PS2 PP FAN2 FF KEY K Return example Status 000 PS1 OK FAN1 OK PS2 OK FAN2 OK KEY L Telnet Status Returns the Telnet status Limit...

Page 22: ...ne 02 in 1 Gb zone 03 as 2 Gb Return RACK 000 Rate 1 0 0 1Gb in zone 01 Reset Performs a warm boot including POST and refreshes all configuration settings All software in Flash memory is reloaded into...

Page 23: ...s configuration implement with switch after setup switch commands 1 setup 000 0120 switch 000 A 1 setup 000 0130 switch 000 B 1 setup 000 0140 switch 000 C 1 setup 000 0150 switch 000 D 1 setup 000 01...

Page 24: ...a new Linux kernel 6 On the host name the new kernel file mtdchar0 if this is not its name already 7 FTP the file mtdchar0 from the host to dev on the FibreCenter 3400 8 When the FTP process is comple...

Page 25: ...ut no device or host connected to cable Cable connected between hub and connected device or host but the device is powered off Fault See information below ATTO FibreCenter port is operating properly P...

Page 26: ...uter 0 1 0 1 15 Echo on set RACK 000 echo off 15 Factory Defaults set RACK 000 factory defaults 15 Flush flush 000 17 Idle Timeout 60 minutes set RACK 000 idle timeout 30 15 IP Address 192 168 1 1 set...

Page 27: ...erence to radio and television reception which can be determined by turning the equipment off and on try to correct the interference by one or more of the following measures Move the receiving antenna...

Page 28: ...ne Monday through Friday Eastern Standard Time 8 00 a m to 8 00 p m or by fax and web site 24 hours a day ATTO Technology Inc 155 CrossPoint Parkway Amherst New York 14068 716 691 1999 voice 716 691 9...

Reviews: