Technician Procedures
SuperTrak™ GEN3 System Operation and Maintenance Manual
145
Rev. 9 (12-2021)
Install a Power Supply
The number of installed power supplies varies, depending on the demands of the
specific SuperTrak conveyance platform.
This diagram describes the location of the components that are required to install
the power supply.
• Make sure the power supply is wired correctly during installation.
Incorrect wiring causes component damage.
• The length of the 28VDC power cable (between the power supply and
track section) must be the same for all power supplies on the same
system to obtain the correct voltage and power balancing.
• It is recommend to distribute the power supplies as evenly as
possible around the SuperTrak conveyance platform.
If possible, install the power supplies on the sections with the highest
performance demands.
• Ensure that each power supply has at least 50 mm of space around
all sides, with venting holes and fan(s), to allow for proper air flow.
For a wiring overview, see the wiring pin-out overview label located on
the electrical door of each straight section and curved section during this
procedure.
A
Power supply OK signal
B
28 VDC power output
location
C
Mounting plate
D
Mounting bracket (1 of 4)
E
Mounting plate screw (1 of 4)
F
AC power input plug
G
Tested label
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...