SuperTrak™ GEN3 System Operation and Maintenance Manual
Rev. 9 (12-2021)
Controls and Connections
Gateway Network Connections
The gateway network connections use Ethernet cables to connect an array of
gateway boards to the controller.
Left and Right Gateway Networks
The SuperTrak conveyance platform is divided into two (2) networks: the left
network, and the right network. Each network begins with a cable that is routed
through the control panel electrical interconnect to the controller.
Turn OFF the 24 V gateway power, and turn OFF the controller before
connecting the gateway network.
Although the gateway network connections are implemented using
standard Ethernet cables, it is not an Ethernet network and should not be
connected to Ethernet devices.
ID
Connection Type Description
A
N/A
Right gateway network.
B
N/A
Control panel electrical interconnect. Left and right gateway network
cables route to the control panel through a flexible conduit.
C
N/A
Left gateway network.
D
RJ45
Right gateway network Ethernet cable.
E
RJ45
Left gateway network Ethernet cable.
F
N/A
Left and right gateway network connection locations.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...