
100
SuperTrak™ GEN3 System Operation and Maintenance Manual
Rev. 9 (12-2021)
Installation
Install a Wedge Adjust
The wedge adjust compensates for excess tolerance between SuperTrak
conveyance platform sections.
Install a Wedge Adjust - Straight Section
1. Verify that the edge of the wedge adjust
plate aligns with the center notch on the
side of the wedge adjust. If required, turn
the adjustment knob to obtain the correct
position.
Make sure that the foam piece is adhered
to the wedge adjust, as shown in the
photo.
2. Place the magnetic shunt into the opening
between the two (2) straight sections.
(The magnetic shunt is an iron block that
improves the continuity of the magnetic
field for shuttle attraction. It has no
mechanical alignment purpose.)
Do not place any objects in the opening
before the magnetic shunt is inserted. The
magnetic shunt requires iron-to-iron contact with the motor core of each
straight section.
3. Align the wedge across two (2) straight
sections.
Make sure the wedge holes align with the
on the t-bars in the t-slot.
4. Loosely install eight (8) washers and eight (8) screws to install the wedge to
the t-bars.
5. Tighten the four (4) screws on the non-
adjustable side of the wedge.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...