92
SuperTrak™ GEN3 System Operation and Maintenance Manual
Rev. 9 (12-2021)
Installation
Install the First SuperTrak Conveyance Platform Section
In this procedure, “section A” references an installed straight section, 180 deg.
section, or group of sections.
1. Position section A in the installation location.
Make sure the installation location has a non-compressing floor (for example;
concrete), to correctly level and align section A.
2. Level the frame.
3. Place a precision spirit level across the top of section A in the directions
illustrated, to determine if additional adjustment is required.
Always use appropriate lifting devices (for example, a forklift or crane)
and use safe lifting practices and procedures when lifting a straight or
curved section.
See
Lift a SuperTrak Conveyance Platform Section
ATS recommends that you obtain relevant information from your national
Health and Safety Authority.
To prevent system damage, keep the system sections upright at all times.
During installation, consider the size of the system. For large systems
(>7 sections) install the middle straight section first and work your way
out to each 180 deg. section. For small systems (<7 sections),
installation can begin from the far left or right 180 deg. section.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...