
Hot Water
on Demand
6
This appliance must be EARTHED.
The EARTH continuity conductor of the electrical
installation must be effectively connected electrically
to all exposed metal parts of other appliances in the
room in Which the heater installed.
SWITCH OFF at mains before carrying out any electrical work.
Refer to the Electrical Loading Table (Table 1) for the correct
cable size.
DO NOT install this product if the line voltage is lower than 175V.
1. Use double coated flexible cable having nominal cross-
sectional area between 4 and 6 mm
2
. (IEC/EN 60335-1).
2. Lead the power cable from the circuit breaker to a “ON/OFF”
double bipolar switch outside the bathroom, then lead a cable
connected to terminal block inside the unit (fig.5).
Note: Conduit entry can only from rear.
3. Connect the cable to terminal block and fully
tighten
them
(insure no cable insulation is trapped under the screws) as
follow: (fig.5)
BROWN or RED FOR LIVE (L)
BLUE or BLACK for NEUTRAL (N)
GREEN or Green/ Yellow for EARTH ( ).
The cable clamp must be used to secure the cable. (fig.6)
4. Check the wiring connection is tightens and correct then close
the front cover. When close back the front cover , please take
note the below procedure:
• To ensure the correct position, turn the temperature knob
insert to OFF position as shown in fig.8. (At the heater base).
• To install the front cover, turn the temperature control knob
to OFF position to align with the knob insert as shown in fig.8
(At the front cover).
For pump models, the same align procedure is apply to both
pump speed VR insert And pump knob.
5. Fix back the screws A & B. (fig. 7)
Do not switch on the electricity supply until the cover has been
fitted.
Fig.5
Fig.6
Fig.7
Fig.8
A
B
Electrical connection