Atlas FAP43T Strategy III Series Install Sheet Download Page 1

1/2

AtlasSound.com

TELEPHONE: (800) 876-3333

FAX (800) 765-3435

1601 JACK MCKAY BLVD.  

ENNIS, TEXAS 75119  U.S.A.

©20

16 

Atlas S

ound L.P

.  

All Rights R

eserved.  

Atlas S

ound is a trademark of 

Atlas S

ound L

.P.  

All other trademarks are the proper

ty of their respecti

ve owner

s.  

All specs are subject to c

hange without notice.  

ATS0

05328 R

evB 3/1

6

Drop Tile Ceiling Installation

1.  Remove 2' x 2' or 2' x 4' tile.

2.  Align adjustable dual rail & C-ring assembly on rear of tile in desired position.

3.  Using the template provided, mark the 8-

3

/

16

" cut out circle with marker and cut hole. 

4.  Affix C-ring assembly to rails using screws provided and position assembly on rear of ceiling tile. Replace tile in grid. Ensure formed ends of tile    
 

bridge rails extend to T-bar tile support rails.

5.  Bring service loop from rear of tile, through the tile bridge / C-ring to the access panel located on top of enclosure. Terminate the service loop to    
 

Phoenix style connector provided (please note polarity).

6.  Insert enclosure through front of tile then follow these steps for the 3 “T-Handle” / dog legs that comprise the Safety First Mounting System.

 

A.  Disengage first “T-Handle” from baffle.

 

B.  Pull “T-Handle” down carefully in a smooth continuous motion until the dog leg engages the C-ring.

 

C.  Carefully push the “T-Handle” upwards until you can feel it disengage from the dog leg.

 

D.  Rotate the “T-Handle” 90 degrees clockwise and align the locking tab with the horizontal slot in the speaker baffle.

 

E.  Push the “T-Handle” into the slot until it clicks, indicating locked position.

 

F.  Repeat steps A - E above for the remaining 2 “T-Handles” / dog legs.

7.   Adjust front mounted switch to desired power tap setting or 8

Ω

 / 6

Ω

 * (See important note regarding 8

Ω

 / 6

Ω

 operation).

8.  Install press-fit grille into front bezel ring. Push baffle upwards until baffle is flush with bezel ring.

9.  For safety and seismic considerations a suspension ring is integrated into the input panel section of unit. Atlas Sound strongly suggests that a  

 

 

support wire be installed from this support point to a suitable anchor point above ceiling grid. In drop tile applications, this wire can usually be  

 

 

installed from an adjacent tile access near speaker location.

Dry Wall (“Hard Deck”) Installation

1.  Using the template provided, mark the 8-

3

/

16

" cut out circle with marker and cut hole.

2.  Place tile bridge rails and C-ring through hole. Use V-shaped edge of C-ring to align tile bridge assembly above ceiling (alignment screws provided    
 

are not required for this type of installation)

3.  Bring service loop from rear of ceiling, through the Tile Bridge / C-ring to access panel located on the side of the enclosure. Terminate service loop   
 

to Phoenix style connector provided (please note polarity).

4.  Insert enclosure through front of tile then follow these steps for the 3 “T-Handle” / dog legs that comprise the Safety First Mounting System.

 

A.  Disengage first “T-Handle” from baffle.

 

B.  Pull “T-Handle” down carefully in a smooth continuous motion until the dog leg engages the C-ring.

 

C.  Carefully push the “T-Handle” upwards until you can feel it disengage from the dog leg.

 

D.  Rotate the “T-Handle” 90 degrees clockwise and align the locking tab with the horizontal slot in the speaker baffle.

 

E.  Push the “T-Handle” into the slot until it clicks, indicating locked position.

 

F.  Repeat steps A - E above for the remaining 2 “T-Handles” / dog legs.

5.  Adjust front mounted switch to desired power tap setting or 8

Ω

/6

Ω

 * (See important note regarding 8

Ω

/6

Ω

 operation)

6.   Install press-fit grille into front bezel ring. Push baffle upwards until baffle is flush with bezel ring.

7.   For safety and seismic considerations a suspension ring is integrated into the input panel section of unit. Atlas Sound strongly suggests that a  

 

 

support wire be installed from this support point to a suitable anchor point above ceiling grid. 

FAP43T Strategy III Series

Install Sheet

Reviews: