Atlas ATL12KW2897-22 User Manual Download Page 3

Dangers of High Voltages and Large Current

Beware of high PV voltage. Please turn-off the DC switch of PV Panel output before and during 

the installation to avoid electric shock.

Beware of high grid voltage. Please turn-off the AC switch of grid connection before and during 

the installation to avoid electric shock.

Do not operate the inverter when it's working, only the LCD and buttons can be touched in 

limited cases by qualified personnel, other parts of the inverter can be touched when the 

inverter is under a safe state (e.g. fully shut-down).

Inspect the connections are good between inverter and PV, battery and grid during installation 

to prevent damages or injuries caused by bad connections.

Inspect relevant existed wiring on-site of the installation is under good condition before 

installation, operation or maintenance.

Make sure the inverter is well grounding, an operator should make sure himself is good 

protected by reasonable and professional insulation measurements (e.g. personal protective 

equipment (PPE)).

Do not connect or disconnect any connections (PV, battery, grid, communication etc.) of the 

inverter when it's working.

Beware of large current of the battery output. Please turn-off the battery module before and 

during the installation to avoid electric shock.

Do not open the inverter when it's working to avoid electric shock and damages from live 

voltage and current from the system.

Beware of burning hurt, the inverter and some parts of the system could be hot when working, 

please do not touch the inverter surface or most of the parts when they are working. During 

inverter working states, only the LCD and buttons could be touched.

All connections must be in accordance with local and national regulations and standards.

Only when permitted by utility grid, the inverter and system can interconnected with the utility 

grid.

Avoid misoperation and Inappropriate Usage

All the work of this product (system design, installation, operation, setting , configuration 

and maintenance must be carried out by qualified personnel as required. 

All the warning lable or nameplate on the inverter must be clearly visible and must not be 

removed, covered or pasted.

The installation should choose a right position and location as required in this manual with 

consideration to safety of users' in future operation.

Please keep the children away from touching or misoperation the inverter and relevant system.

1.    Safety

1.1   Safety Instruction

The qualified personnel should have had training in the installation and commissioning of 

the electrical system as well as dealing with hazards, also they should have the knowledge 

of the manual and other related documents. As the installer or operator they are required 

to be familiar with local regulations and directives. 

Please carefully read this manual before any work carried out on this inverter, after the 

installation, please keep this manual carefully stored and easy to access at any time.

General Safety Instructions

The inverter has been designed and tested strictly according to international safety regulations. Read all safety 

instructions carefully prior to any work and observe them at all times when working on or with the inverter. The 

operator must be qualified personnel and the installation must be capable with relevant national or international 

standards or regulations. 

Incorrect operation or work may cause:

-     injury or death to the operator or a third party

-     damage to the inverter and other properties belonging to the operator or a third party.

There are many safety issues need to be carefully notified before, during and after the installation, and also in 

future operation and maintenance, following is important safety notifications to operator, owner and user of 

this product in appropriate usage.

Important Safety Notifications

01

02

Summary of Contents for ATL12KW2897-22

Page 1: ...Version EN UM 1 0 00 Atlas Energy Solutions 848 W 1440 N suite 120 Logan UT 84321 1 435 233 6115...

Page 2: ...CT Meter connection 3 6 4 13 Working with Generator 3 7 15 Generator system connection 3 7 1 15 Generator Startup and stop settings 3 7 2 17 Monitor System Setup 3 10 21 3 10 1 3 10 2 Wifi GPRS 4G WLA...

Page 3: ...can interconnected with the utility grid Avoid misoperation and Inappropriate Usage All the work of this product system design installation operation setting configuration and maintenance must be car...

Page 4: ...system B AC Coupling with existed solar system C On grid solar system without battery Support EPS even without battery D Off grid and back up applications E Single and three phase paralleling system...

Page 5: ...ing bracket then drill 4 holes of 8mm 5 16inch diameter and make sure the depth of the holes is deeper than 50mm 2inch Step3 Hang the inverter onto the wall mounting bracket and lock the inverter on t...

Page 6: ...CAN RS485 please check Chapter 3 5 2 for Pin definition please check Chapter 3 9 for Parallel connection e Parallel communication port f FAN1 2 3 g TEMP Connection for temperature sensor of lead acid...

Page 7: ...duit fittings are fastened reliably and seal the cable entry holes 3 5 Battery Connection 3 5 1 Battery power cable connection 2 3 0 4 0 AWG 85 100 mm 600V Cable Requirement 12K Step 2 Route the batte...

Page 8: ...y master and slave settings 1 The temperature sensor for lead acid battery is optional If you need it please contact distributor for purchasing For Li ion battery For Lead acid battery 2 There are thr...

Page 9: ...talled at the service entry point in or near the main service panel We standard supply 2 CT for one inverter The CT interface for 2 CTs connection is a RJ45 port we have made a RJ45 plug on those 2 CT...

Page 10: ...ter Service Disconnect Generator Inverter Disconnect Generator Disconnect Backup Panel Generator Connection Whole Home Backup PE N PE L1 L2 PE N L2 L1 PE N L2 L1 2 wire start CT 2 CT 1 When generator...

Page 11: ...kw h 10A Generator Start Conditions Generator Stop Conditions when battery voltage or SOC higher than Charge end Volt SOC settings value When grid is off the hybrid inverter will work as a power sourc...

Page 12: ...erent using scenarios Up to 10 units can be paralleled to reach a capacity of 120kW Wiring diagram is as below The manual bypass switch connect loads to EPS panel for default When inverters fail users...

Page 13: ...ur mobile phone to the BAxxxxxxxx wireless network where BAxxxxxxxx is the serial number of the WiFi dongle luxpower_5G luxpowertek luxpowertek_5g HF WIFI ChinaNet EWP ChinaNet wG49 CMCC BAKR luxpower...

Page 14: ...arallel cable communication Interface DRM Interface Meter INV485 4 Operation Guide 4 1 Operation Mode The inverter has different working mode to meet customers various demands the working modes are as...

Page 15: ...2 3 1 Import Power Example 4 1 3 AC Charge Mode Users can charge battery with grid power when electricity price is cheap and discharge battery power to supply load or export to the grid when electric...

Page 16: ...m of the screen you ll see all current and historical fault warning information on this page Alarm record M8 Rx fault Inconsistant Fault status Fault record Alarm status M3 Rx failure Model fault Rese...

Page 17: ...its CT ratio is either 1000 1 or 3000 1 and set it accordingly the battery brand in the Lithium brand drop down list Meter type Please select it according to the meter that s to be installed Offgrid...

Page 18: ...ntact Luxpower service or your inverter supplier 1 Check if the L1 L2 and N wires are connected correctly at inverter EPS output port 2 Disconnect the EPS breaker to see if fault remains If fault pers...

Page 19: ...n EPS port Restart inverter If fault still exists contact Luxpower service or your inverter supplier Check if meter communication cable is connected correctly on inverter and meter side RSD Active Off...

Page 20: ...llowing up the below diagram if there is problem with the fans Turn off the system and wait for more than 5 minutes before disassembling the machine c Loosen the screws and remove them d Remove the fa...

Page 21: ...an activation the Rule21 function Setting the value in the corresponding blank Before setting you can read the default value first and then set the parameter of the function that needs to be modified...

Page 22: ...mum Adjustable Range 61 0Hz 180s 180 50 0Hz 160ms 61 8Hz 160ms Maximum Adjustable Range 59 0Hz 66 0Hz 1000s 1000s 57 0Hz 1000s 66 0Hz 1000s 6 2 4 Specified Power factor SPF Parameter name Default Valu...

Page 23: ...Q2 Q3 Constant Reactive Power 44 of nameplate apparent power Parameter name Default Value Under excited Under excited Over excited Disable Constant Reactive Power Mode Minimum Adjustable Range Under e...

Page 24: ...208V 10400 18000 250 250 25 15 15 34 17 17 100 140 100 600 120 500 360 3 2 1 1 180 270 240 0 8 0 8 leading Adjustable 60 55 65 3 35 0 99 full load 240 120 240 120 208 3 20 60 97 5 94 99 9 48 40 60 Le...

Reviews: