Atlas ATL12KW2897-22 User Manual Download Page 18

5.   Troubleshooting & Maintenance

a. Check the inverter every 6 months or 1 year to verify if there are damages on cables, accessories, 

terminals and the inverter itself.

Inverter Maintenance

5.2   LED Displays

5.1    Regular Maintenance

b. Check the inverter every 6 months to verify if the operating parameter is normal and there is no 

abnormal heating or noise from the inverter.

1. Fault on the LCD

31

32

c. Check the inverter every 6 months to confirm there is nothing that covers the inverter heat sink, if there 

is, shut-down the inverter and clear the heat sink.

Battery Maintenance

Follow the manufacturer's requirements on maintenance. When you carry out these works on batteries, 

please make sure to fully shut-down the inverter for safety consideration.

Display

LED

Description

Green LED

Solid lit

Suggestion

Flashing

Working normally

Firmware upgrading

Wait till upgrading complete

Yellow LED

Red LED

Solid lit

Solid lit

Warning, inverter working

Need troubleshooting

Fault, inverter stop work

Need troubleshooting

5.3   Troubleshooting Based On LCD Displays

Once there is any warning or fault occurring, users can troubleshoot according to the LED status and 

the warning/fault information on the LCD.

If the dot on the left of fault item is red, it means the fault is active. When it is grey, it means the fault is 

deactive

Alarm record

M8 Rx fault

Inconsistant

Fault status 

Fault record

Alarm status

M3 Rx failure

Model fault

ReservedB

ReservedC

ReservedD

ReservedE

ReservedF

ReservedG

ReservedH

ReservedI

ReservedJ

Eps short circuit

Bus short circuit 

ReservedK

Relay fault

M8 Tx failure

M3 Tx failure

Vbus over range

Eps connect fault

PV volt high

Hard over curr

Neutral fault

PV short circuit

Temperature fault

Bus sample fault

ReservedL

Eps power reversed

ReservedA

M3 microprocessor fails to receive 
data from DSP

Model fault

Incorrect model value

Eps short circuit

Inverter detected short-circuit on 
EPS output terminals

Restart inverter, if the error still exists, contact 
Luxpower service or your inverter supplier.

1. Check if the L1, L2 and N wires are connected 
correctly at inverter EPS output port;

2. Disconnect the EPS breaker to see if fault 
remains. If fault persists, contact Luxpower 
service or your inverter supplier.

Meaning

Fault

Troubleshooting

M3 Rx failure

Bus short circuit

Relay fault

DC Bus is short circuited

Relay abnormal

Eps power reversed

Inverter detected power flowing 
into EPS port

M3 Tx failure

DSP fails to receive data from M3 
microprocessor

M8 Tx failure

DSP fails to receive data from M8 
microprocessor

PV volt high

PV voltage is too high

Please check if the PV string voltage is within the 
inverter specification. If string voltage is within 
range, and this fault still appears, contact Luxpower 
service o your inverter supplier.

Please check if the PV string voltage is within 
the inverter specification. If string voltage is 
within range, and this fault still appears, contact 
Luxpower service or your inverter supplier.

Vbus over range

Eps connect fault

DC Bus voltage too high

EPS port and grid port are 
connected mixed up 

Check if the wires on EPS port and grid port are 
connected correctly. If the error exists, contact 
Luxpower service or your inverter supplier.

Restart inverter, if the error still exists, contact 
Luxpower service or your inverter supplier.

4.4   Start-up and shut down the inverter

Step1. Turn on the battery system firstly

then turn on the DC breaker between battery and inverter. 

Step2. Make sure the PV voltage of the strings are higher than 120V ,and check if the inverter works in PV 

charge or PV charge back-up mode.

Step3. Make sure step1and 2 above work properly before turning on the grid power or generator breaker, 

and check if the inverter can go to bypass mode and on-grid mode normally.

Danger: Do not disconnect the battery , PV and AC input power under load.

If there is emergency issue , and you have to shut down the inverter ,please follow the steps as below.

Step1. Turn off the Grid breaker of the inverter.

4.4.1   Start up the inverter

4.4.2   Shut down the inverter

Step2. Switch off the load breaker.

Step3. Turn off PV breaker and then battery breaker, waiting for the LCD to go off.

Summary of Contents for ATL12KW2897-22

Page 1: ...Version EN UM 1 0 00 Atlas Energy Solutions 848 W 1440 N suite 120 Logan UT 84321 1 435 233 6115...

Page 2: ...CT Meter connection 3 6 4 13 Working with Generator 3 7 15 Generator system connection 3 7 1 15 Generator Startup and stop settings 3 7 2 17 Monitor System Setup 3 10 21 3 10 1 3 10 2 Wifi GPRS 4G WLA...

Page 3: ...can interconnected with the utility grid Avoid misoperation and Inappropriate Usage All the work of this product system design installation operation setting configuration and maintenance must be car...

Page 4: ...system B AC Coupling with existed solar system C On grid solar system without battery Support EPS even without battery D Off grid and back up applications E Single and three phase paralleling system...

Page 5: ...ing bracket then drill 4 holes of 8mm 5 16inch diameter and make sure the depth of the holes is deeper than 50mm 2inch Step3 Hang the inverter onto the wall mounting bracket and lock the inverter on t...

Page 6: ...CAN RS485 please check Chapter 3 5 2 for Pin definition please check Chapter 3 9 for Parallel connection e Parallel communication port f FAN1 2 3 g TEMP Connection for temperature sensor of lead acid...

Page 7: ...duit fittings are fastened reliably and seal the cable entry holes 3 5 Battery Connection 3 5 1 Battery power cable connection 2 3 0 4 0 AWG 85 100 mm 600V Cable Requirement 12K Step 2 Route the batte...

Page 8: ...y master and slave settings 1 The temperature sensor for lead acid battery is optional If you need it please contact distributor for purchasing For Li ion battery For Lead acid battery 2 There are thr...

Page 9: ...talled at the service entry point in or near the main service panel We standard supply 2 CT for one inverter The CT interface for 2 CTs connection is a RJ45 port we have made a RJ45 plug on those 2 CT...

Page 10: ...ter Service Disconnect Generator Inverter Disconnect Generator Disconnect Backup Panel Generator Connection Whole Home Backup PE N PE L1 L2 PE N L2 L1 PE N L2 L1 2 wire start CT 2 CT 1 When generator...

Page 11: ...kw h 10A Generator Start Conditions Generator Stop Conditions when battery voltage or SOC higher than Charge end Volt SOC settings value When grid is off the hybrid inverter will work as a power sourc...

Page 12: ...erent using scenarios Up to 10 units can be paralleled to reach a capacity of 120kW Wiring diagram is as below The manual bypass switch connect loads to EPS panel for default When inverters fail users...

Page 13: ...ur mobile phone to the BAxxxxxxxx wireless network where BAxxxxxxxx is the serial number of the WiFi dongle luxpower_5G luxpowertek luxpowertek_5g HF WIFI ChinaNet EWP ChinaNet wG49 CMCC BAKR luxpower...

Page 14: ...arallel cable communication Interface DRM Interface Meter INV485 4 Operation Guide 4 1 Operation Mode The inverter has different working mode to meet customers various demands the working modes are as...

Page 15: ...2 3 1 Import Power Example 4 1 3 AC Charge Mode Users can charge battery with grid power when electricity price is cheap and discharge battery power to supply load or export to the grid when electric...

Page 16: ...m of the screen you ll see all current and historical fault warning information on this page Alarm record M8 Rx fault Inconsistant Fault status Fault record Alarm status M3 Rx failure Model fault Rese...

Page 17: ...its CT ratio is either 1000 1 or 3000 1 and set it accordingly the battery brand in the Lithium brand drop down list Meter type Please select it according to the meter that s to be installed Offgrid...

Page 18: ...ntact Luxpower service or your inverter supplier 1 Check if the L1 L2 and N wires are connected correctly at inverter EPS output port 2 Disconnect the EPS breaker to see if fault remains If fault pers...

Page 19: ...n EPS port Restart inverter If fault still exists contact Luxpower service or your inverter supplier Check if meter communication cable is connected correctly on inverter and meter side RSD Active Off...

Page 20: ...llowing up the below diagram if there is problem with the fans Turn off the system and wait for more than 5 minutes before disassembling the machine c Loosen the screws and remove them d Remove the fa...

Page 21: ...an activation the Rule21 function Setting the value in the corresponding blank Before setting you can read the default value first and then set the parameter of the function that needs to be modified...

Page 22: ...mum Adjustable Range 61 0Hz 180s 180 50 0Hz 160ms 61 8Hz 160ms Maximum Adjustable Range 59 0Hz 66 0Hz 1000s 1000s 57 0Hz 1000s 66 0Hz 1000s 6 2 4 Specified Power factor SPF Parameter name Default Valu...

Page 23: ...Q2 Q3 Constant Reactive Power 44 of nameplate apparent power Parameter name Default Value Under excited Under excited Over excited Disable Constant Reactive Power Mode Minimum Adjustable Range Under e...

Page 24: ...208V 10400 18000 250 250 25 15 15 34 17 17 100 140 100 600 120 500 360 3 2 1 1 180 270 240 0 8 0 8 leading Adjustable 60 55 65 3 35 0 99 full load 240 120 240 120 208 3 20 60 97 5 94 99 9 48 40 60 Le...

Reviews: