Atlas ATL12KW2897-22 User Manual Download Page 13

21

22

3.10   Monitor System Setup

Please put the CAN communication PIN to on status for the first and the end inverter

1

0

3

0 0

1

0

3

0 0

1

0

3

1 1

Parallel line(n to 1)

The max parallel quantity is 10, so 2<n<10

Parallel line1

Parallel line2

Parallel line(n-1 to n)

No.2

No.n-1

No.n

No.1

1

0

3

1 1

If the parallel cable is not enough or long enough, please make a straight pin to pin cable 

Settings for paralleling function in monitor system

1. Set up monitoring for the system, add all dongles into one station. Users can login to visit the monitor system, 

Configuration->Station->Plant Management->Add dongle to add dongles.

3. Set the system as a parallel group in the monitor system

2. Enable share battery for the system if the system share one battery bank, otherwise disable the shared battery function

Please contact your inverter supplier for more detailed guidance for paralleling system

3.10.1   Wifi/GPRS/4G/WLAN dongle connection

3.10.2  Setup the monitor system

1. Sign up an account on the mobile phone APP or Website

The "customer code" is a code we assigned to your distributor 
or installer. You can contact your supplier for their code.

LOGIN

Version 1.7.1

or

Remember username

Auto login

LOCAL CONNECT

REGISTER

WIFI MODULE CONNECT

User name

Pass word

* E-mail

* Language

* Tel number

* Station name

* Nominal power (W)

* Daylight saving time

* Income formula (kWh)

* Continent

* Region

* Country

* Time zone

* Address

* Customer code

* Datalog serial number

* PIN

REGISTER

RMB (

¥

)

Asia

East Asia

China

English

1. Connect your mobile phone to the “BAxxxxxxxx” wireless network where “BAxxxxxxxx” is the serial number of the WiFi dongle. 

luxpower_5G

luxpowertek

luxpowertek_5g

HF-WIFI

ChinaNet-EWP

ChinaNet-wG49

CMCC-BAKR

luxpower

WI-FI

MORE SETTINGS

DONE

12:20

CMCC

BA 19520257

Obtaining address...

LOGIN

Version 1.7.1

or

Remember username

Auto login

LOCAL CONNECT

REGISTER

WIFI MODULE CONNECT

luxpower

Pass word

Set WIFI password to Inverter WIFI module

SSID:

Password:

Please input password

unknown ssid

Homewifi Connect

TCP Set

2. Click the "WiFi MODULE CONNECT" button  on the APP

3. Select the home WiFi that the WiFi dongle is to be connected to, enter the WiFi's password. And then click "HomeWifi Connect". The WiFi 

dongle will restart and try to connect to our server automatically.

4 . Check the LEDs' status on the WiFi dongle. The middle light should be solid lit when the WiFi dongle connects to our server successfully.

5. Now you can disconnect your mobile phone from the “BAxxxxxxxx” wireless network. Login on the LuxPowerView APP with 

your account, you'll find the inverter information already appears. Now you'll be able to monitor and control the inverter remotely 

on any smart phone or computer that has Internet connection.

Users can use WiFi/ WLAN /4G /2G dongle  to monitor their inverter, and view the monitoring data on computer or 

smart phone remotely.

To view monitoring data on computer browser, just access: 

https://server.luxpowertek.com and login with their account.

To view data on smartphone, please download the LuxPowerView APP from Google Play or Apple APP store, then login 

with their user account.

2. Create station and add dongle for the station

3.10.3 Set homewifi password to dongle

add station, add wifi module

Summary of Contents for ATL12KW2897-22

Page 1: ...Version EN UM 1 0 00 Atlas Energy Solutions 848 W 1440 N suite 120 Logan UT 84321 1 435 233 6115...

Page 2: ...CT Meter connection 3 6 4 13 Working with Generator 3 7 15 Generator system connection 3 7 1 15 Generator Startup and stop settings 3 7 2 17 Monitor System Setup 3 10 21 3 10 1 3 10 2 Wifi GPRS 4G WLA...

Page 3: ...can interconnected with the utility grid Avoid misoperation and Inappropriate Usage All the work of this product system design installation operation setting configuration and maintenance must be car...

Page 4: ...system B AC Coupling with existed solar system C On grid solar system without battery Support EPS even without battery D Off grid and back up applications E Single and three phase paralleling system...

Page 5: ...ing bracket then drill 4 holes of 8mm 5 16inch diameter and make sure the depth of the holes is deeper than 50mm 2inch Step3 Hang the inverter onto the wall mounting bracket and lock the inverter on t...

Page 6: ...CAN RS485 please check Chapter 3 5 2 for Pin definition please check Chapter 3 9 for Parallel connection e Parallel communication port f FAN1 2 3 g TEMP Connection for temperature sensor of lead acid...

Page 7: ...duit fittings are fastened reliably and seal the cable entry holes 3 5 Battery Connection 3 5 1 Battery power cable connection 2 3 0 4 0 AWG 85 100 mm 600V Cable Requirement 12K Step 2 Route the batte...

Page 8: ...y master and slave settings 1 The temperature sensor for lead acid battery is optional If you need it please contact distributor for purchasing For Li ion battery For Lead acid battery 2 There are thr...

Page 9: ...talled at the service entry point in or near the main service panel We standard supply 2 CT for one inverter The CT interface for 2 CTs connection is a RJ45 port we have made a RJ45 plug on those 2 CT...

Page 10: ...ter Service Disconnect Generator Inverter Disconnect Generator Disconnect Backup Panel Generator Connection Whole Home Backup PE N PE L1 L2 PE N L2 L1 PE N L2 L1 2 wire start CT 2 CT 1 When generator...

Page 11: ...kw h 10A Generator Start Conditions Generator Stop Conditions when battery voltage or SOC higher than Charge end Volt SOC settings value When grid is off the hybrid inverter will work as a power sourc...

Page 12: ...erent using scenarios Up to 10 units can be paralleled to reach a capacity of 120kW Wiring diagram is as below The manual bypass switch connect loads to EPS panel for default When inverters fail users...

Page 13: ...ur mobile phone to the BAxxxxxxxx wireless network where BAxxxxxxxx is the serial number of the WiFi dongle luxpower_5G luxpowertek luxpowertek_5g HF WIFI ChinaNet EWP ChinaNet wG49 CMCC BAKR luxpower...

Page 14: ...arallel cable communication Interface DRM Interface Meter INV485 4 Operation Guide 4 1 Operation Mode The inverter has different working mode to meet customers various demands the working modes are as...

Page 15: ...2 3 1 Import Power Example 4 1 3 AC Charge Mode Users can charge battery with grid power when electricity price is cheap and discharge battery power to supply load or export to the grid when electric...

Page 16: ...m of the screen you ll see all current and historical fault warning information on this page Alarm record M8 Rx fault Inconsistant Fault status Fault record Alarm status M3 Rx failure Model fault Rese...

Page 17: ...its CT ratio is either 1000 1 or 3000 1 and set it accordingly the battery brand in the Lithium brand drop down list Meter type Please select it according to the meter that s to be installed Offgrid...

Page 18: ...ntact Luxpower service or your inverter supplier 1 Check if the L1 L2 and N wires are connected correctly at inverter EPS output port 2 Disconnect the EPS breaker to see if fault remains If fault pers...

Page 19: ...n EPS port Restart inverter If fault still exists contact Luxpower service or your inverter supplier Check if meter communication cable is connected correctly on inverter and meter side RSD Active Off...

Page 20: ...llowing up the below diagram if there is problem with the fans Turn off the system and wait for more than 5 minutes before disassembling the machine c Loosen the screws and remove them d Remove the fa...

Page 21: ...an activation the Rule21 function Setting the value in the corresponding blank Before setting you can read the default value first and then set the parameter of the function that needs to be modified...

Page 22: ...mum Adjustable Range 61 0Hz 180s 180 50 0Hz 160ms 61 8Hz 160ms Maximum Adjustable Range 59 0Hz 66 0Hz 1000s 1000s 57 0Hz 1000s 66 0Hz 1000s 6 2 4 Specified Power factor SPF Parameter name Default Valu...

Page 23: ...Q2 Q3 Constant Reactive Power 44 of nameplate apparent power Parameter name Default Value Under excited Under excited Over excited Disable Constant Reactive Power Mode Minimum Adjustable Range Under e...

Page 24: ...208V 10400 18000 250 250 25 15 15 34 17 17 100 140 100 600 120 500 360 3 2 1 1 180 270 240 0 8 0 8 leading Adjustable 60 55 65 3 35 0 99 full load 240 120 240 120 208 3 20 60 97 5 94 99 9 48 40 60 Le...

Reviews: