Atlas ATL12KW2897-22 User Manual Download Page 11

17

18

3.7.2     Generator Startup and Stop settings

Bat charge current limit(A)

AC charge

Time  1

Time  2

Time  3

:

:

:

:

:

:

Bat charge control  

 Debug 

Charge 

Discharge 

Device info.

Basic 

Advanced 

Set

Use SOC %

Use Bat V

Set

Stop AC charge SOC(%)

Stop AC charge Volt (V)

 AC charge power(kW)

Depends on the Bat charge control setting, system will use either battery SOC or battery voltage to 

judge if system need to start or stop the generator.

-When battery is discharged to cut-off settings 

or there is force charge request from battery.

or when the battery voltage or SOC lower than Generator Charge start Volt/SOC settings, 

3.8     AC Coupling Installation Connection

The inverter supports AC coupling connection with existing grid-interactive solar system. The existing 

solar system is connected to the inverter's EPS port.

L1 L2

N

EPS 

GEN

GRID

L1

L2

L1

L2

Utility Meter

Main Panel

Inverter Disconnect

Backup Panel

Connection for AC coupled solar system

PE

N

PE

L1

L2

N

PE

L1

L2

Existing Solar
System

CT

CT 2

CT 1

Kw. h

7 9 8 6 6

480r/kw. h 10A

Generator Start Conditions

Generator Stop Conditions

when battery voltage or SOC higher than  Charge end Volt/SOC settings value.

When grid is off, the hybrid inverter will work as a power source for the grid interactive inverter to synchronize 

and feed power to the micro-grid. The loads will be first supplied by solar power. If solar panels are generating 

more power than load consumption, the excess solar power will be stored to the battery. When solar power 

exceeds the sum of load power and max battery charging power, e.g. when battery is nearly full. The inverter will 

signal the grid interactive inverter to reduce power via the frequency shifting power reduction mechanism, thus 

to maintain the balance of generation and consumption of the microgrid system.

When grid is on, the EPS terminal is connected to grid terminal inside inverter by a passthrough relay. so the 

hybrid inverter will bypass the interactive inverter AC to grid in this situation. The spec of the passthrough relay

is 200A. 

When utility fails and

 Debug 

Charge 

Discharge 

Device info.

Basic 

Advanced 

Generator

Charge start Volt(V)

Charge end Volt(V)

Gen rated power(kW)

Charge current limit(A)

Charge start SOC(%)

Charge end SOC(%)

Set

Summary of Contents for ATL12KW2897-22

Page 1: ...Version EN UM 1 0 00 Atlas Energy Solutions 848 W 1440 N suite 120 Logan UT 84321 1 435 233 6115...

Page 2: ...CT Meter connection 3 6 4 13 Working with Generator 3 7 15 Generator system connection 3 7 1 15 Generator Startup and stop settings 3 7 2 17 Monitor System Setup 3 10 21 3 10 1 3 10 2 Wifi GPRS 4G WLA...

Page 3: ...can interconnected with the utility grid Avoid misoperation and Inappropriate Usage All the work of this product system design installation operation setting configuration and maintenance must be car...

Page 4: ...system B AC Coupling with existed solar system C On grid solar system without battery Support EPS even without battery D Off grid and back up applications E Single and three phase paralleling system...

Page 5: ...ing bracket then drill 4 holes of 8mm 5 16inch diameter and make sure the depth of the holes is deeper than 50mm 2inch Step3 Hang the inverter onto the wall mounting bracket and lock the inverter on t...

Page 6: ...CAN RS485 please check Chapter 3 5 2 for Pin definition please check Chapter 3 9 for Parallel connection e Parallel communication port f FAN1 2 3 g TEMP Connection for temperature sensor of lead acid...

Page 7: ...duit fittings are fastened reliably and seal the cable entry holes 3 5 Battery Connection 3 5 1 Battery power cable connection 2 3 0 4 0 AWG 85 100 mm 600V Cable Requirement 12K Step 2 Route the batte...

Page 8: ...y master and slave settings 1 The temperature sensor for lead acid battery is optional If you need it please contact distributor for purchasing For Li ion battery For Lead acid battery 2 There are thr...

Page 9: ...talled at the service entry point in or near the main service panel We standard supply 2 CT for one inverter The CT interface for 2 CTs connection is a RJ45 port we have made a RJ45 plug on those 2 CT...

Page 10: ...ter Service Disconnect Generator Inverter Disconnect Generator Disconnect Backup Panel Generator Connection Whole Home Backup PE N PE L1 L2 PE N L2 L1 PE N L2 L1 2 wire start CT 2 CT 1 When generator...

Page 11: ...kw h 10A Generator Start Conditions Generator Stop Conditions when battery voltage or SOC higher than Charge end Volt SOC settings value When grid is off the hybrid inverter will work as a power sourc...

Page 12: ...erent using scenarios Up to 10 units can be paralleled to reach a capacity of 120kW Wiring diagram is as below The manual bypass switch connect loads to EPS panel for default When inverters fail users...

Page 13: ...ur mobile phone to the BAxxxxxxxx wireless network where BAxxxxxxxx is the serial number of the WiFi dongle luxpower_5G luxpowertek luxpowertek_5g HF WIFI ChinaNet EWP ChinaNet wG49 CMCC BAKR luxpower...

Page 14: ...arallel cable communication Interface DRM Interface Meter INV485 4 Operation Guide 4 1 Operation Mode The inverter has different working mode to meet customers various demands the working modes are as...

Page 15: ...2 3 1 Import Power Example 4 1 3 AC Charge Mode Users can charge battery with grid power when electricity price is cheap and discharge battery power to supply load or export to the grid when electric...

Page 16: ...m of the screen you ll see all current and historical fault warning information on this page Alarm record M8 Rx fault Inconsistant Fault status Fault record Alarm status M3 Rx failure Model fault Rese...

Page 17: ...its CT ratio is either 1000 1 or 3000 1 and set it accordingly the battery brand in the Lithium brand drop down list Meter type Please select it according to the meter that s to be installed Offgrid...

Page 18: ...ntact Luxpower service or your inverter supplier 1 Check if the L1 L2 and N wires are connected correctly at inverter EPS output port 2 Disconnect the EPS breaker to see if fault remains If fault pers...

Page 19: ...n EPS port Restart inverter If fault still exists contact Luxpower service or your inverter supplier Check if meter communication cable is connected correctly on inverter and meter side RSD Active Off...

Page 20: ...llowing up the below diagram if there is problem with the fans Turn off the system and wait for more than 5 minutes before disassembling the machine c Loosen the screws and remove them d Remove the fa...

Page 21: ...an activation the Rule21 function Setting the value in the corresponding blank Before setting you can read the default value first and then set the parameter of the function that needs to be modified...

Page 22: ...mum Adjustable Range 61 0Hz 180s 180 50 0Hz 160ms 61 8Hz 160ms Maximum Adjustable Range 59 0Hz 66 0Hz 1000s 1000s 57 0Hz 1000s 66 0Hz 1000s 6 2 4 Specified Power factor SPF Parameter name Default Valu...

Page 23: ...Q2 Q3 Constant Reactive Power 44 of nameplate apparent power Parameter name Default Value Under excited Under excited Over excited Disable Constant Reactive Power Mode Minimum Adjustable Range Under e...

Page 24: ...208V 10400 18000 250 250 25 15 15 34 17 17 100 140 100 600 120 500 360 3 2 1 1 180 270 240 0 8 0 8 leading Adjustable 60 55 65 3 35 0 99 full load 240 120 240 120 208 3 20 60 97 5 94 99 9 48 40 60 Le...

Reviews: