Tightening
9836 3521 01
353
6.5.5.5 Cycle RM
To enable Reject Management also on Monitoring errors all Monitoring checks can be configured as either
Fatal or Repairable.
When all bolts have reported Cycle End to the station and nothing is to be repaired the station orders the
bolts to do monitoring of the cycle. Then the bolt starts evaluation of the Monitoring conditions. The
spindles will report the result of the Monitoring checks to the station and if at least one not already
terminated spindle reports Repairable or Fatal reject management will be executed. The station uses the
status and RM settings of all not terminated rejected bolts to determine the reject action. The station
change state to Evaluating when monitoring starts, but re-enters state Running if Reject Management is
started.
Note 1
For configuration of Reject Action on a CE step only the
First failure
and
Fatal failure
settings
are available.
Note 2
No terminated spindles are involved in reject action for the cycle. This includes OK spindles that
are terminated after the last step before CE without termination step and thus keeps status OK.
Monitoring check results always affect the status of the individual bolt. OK or OKR bolts become
NOK if monitoring fails and no reject management is done.
Bolts that have been terminated before they reach the CE step will
not
participate in Reject Management
executed on the CE step. Bolts that have status NOK before the Monitoring checks are evaluated are
considered Repairable. There are only two possibilities for a bolt to reach the CE step with status NOK.
The first is that it as a reject bolt has been ordered to Continue (failing step was not repaired). The second
is that it as reject bolt has been ordered to Retry, but had no retry configured (failing step was not
repaired).
The status reported to the station after monitoring is constructed using the bolt status after executing the
ordinary steps and the result from evaluating monitoring. A cycle that is NOK before monitoring cannot
become OK due to correct monitoring checks.
However, a bolt that has status NOKRM before monitoring is evaluated will keep the NOKRM status also if
one or more monitoring checks fail.
The below table shows the possible outcome for the bolts involved in RM on the CE step (that is, all not
already terminated bolts):
Status before
evaluation of
Monitoring
checks
Result of
Monitoring
checks
Reject Management action
taken
Best possible status after
repair
OK
Acceptable
None
OK
Repairable
According to First failure settings
OKR
Fatal
According to Fatal failure settings
NOK
OKR
Acceptable
None
OKR
Repairable
According to First failure settings
OKR
Fatal
According to Fatal failure settings
NOK
Summary of Contents for PowerMACS 4000
Page 2: ......
Page 46: ...System Architecture 46 9836 3521 01...
Page 267: ...Tightening 9836 3521 01 267...
Page 400: ...Tightening 400 9836 3521 01...
Page 486: ...Peripheral Devices 486 9836 3521 01...
Page 622: ...Peripheral Devices 622 9836 3521 01...
Page 664: ...References 664 9836 3521 01...
Page 668: ...9836 3521 01 2010 11 Edition 10 3 0 www atlascopco com...