
The device has to be installed on a flat and horizontal floor and
should not be in contact with a wall.
Overview
InstallaBon
OperaBon
Maintenance
Warranty
InstallaJon
The non-‐respect of installaJon guidelines can cause poor performances of the system.
1. Product installaJon
In accordance with AS/NZS 60335.2.21 the water heaters must be fixed to the ground using the aTachment
provided and in compliance with the New Zealand Building Code Clause G12, Seismic restraint of storage water
heaters.
The clearance required needs to be adequate for service/replacement of cold water inlet piping devices, PTR
valve and tempering valves (where fiTed), elements and thermostats. This may be facilitated by correct
orientaBon of the cover posiBons when installing. There are no operaBonal clearance limitaBons to surrounding
structure. PTR valve removal requires approximately 150 mm for withdrawal.
AS/NZS 3500.4.2 – NaBonal plumbing & drainage. Hot Water Supply Systems – Acceptable soluBons.
The floor has to support a load of 400 kg minimum (surface below the water
The selected place of installaBon has to conform to the protecBon level IP X1B,
CombusBble Material :
It is recommended to not place combusBble material on or adjacent to the water heater.
For internal ( inside home) installaJons, a safe tray is recommended in accordance with AS/NZS 3500.4
License plate placed
over the hot water pipe
has to be easily visible.
Before filling with water
the water heater has to
be levelled.
Fix the water heater
with the supplied
metal strap.
Minimum height from ground to ceiling
to Blt the device :
200L : 1681mm
270L : 2007mm
11
Summary of Contents for HPWH 200 Lt
Page 1: ......