Atlantic BF1900 Instruction Manual Download Page 8

8

SETTING THE FILTERFALLS

  It is always recommended that the FilterFalls be placed on undisturbed soil if possible. If the 
installation calls for the FilterFalls to be elevated above existing grade, it is critical to compact 
the area thoroughly. This will ensure that the FilterFalls will not settle out-of-level over time. 
The use of cinder blocks or bricks under the falls to raise it up will help reduce the chance 
of settling. 
   The FilterFalls can be placed adjacent to the pond edge to create a single waterfall, or pulled 
away from the pond to create a streambed effect. Refer to the surface area recommendations 
on page 3 to ensure that the streambed is properly sized.
   Once you have placed the unit, make sure it is level from side to side and check the level 
from front to back. FilterFalls should always be installed tilted slightly forward about ¼”. 
This will ensure that water never leaks out over the back of the enclosure. When you are 
finished positioning the unit, weigh it down with a few rocks to keep it in place while you 
backfill and make your liner and plumbing connections. Apply silicone on the threads of the 
MTA. Screw the MTA into the bulkhead until tight. Use PVC Glue (not included) to glue the 
PVC flex hose into the MTA.

Do not completely backfill the FilterFalls until all of your plumbing connections are 
made and the liner has been attached.

Figure 10.

  Remove the spring clips and pull the liner away from the face of the enclosure. Make sure that 
the front of the FilterFalls and the back side of the liner are clean and free of debris. Apply a 
consistent bead of Atlantic fish-safe silicone to the face of the FilterFalls along the center line 
of the threaded inserts. 
  Return the liner to the face of the FilterFalls and hold it in place by attaching the spring clips 
to the rolled lip on either side of the spillway (Figure 10). 

LINER ATTACHMENT

  Atlantic FilterFalls come equipped with a solid spillway, threaded inserts and a ‘U’ shaped 
wrap-around flange to provide the best possible seal.
  Start by positioning the liner. Pull the liner up the face of the FilterFalls and drape a minimum 
of 6” of liner over the top of the enclosure. Use the provided spring clips to temporarily hold the 
liner in place.  Leave some excess slack in the liner below the spillway. This will help to alleviate 
any future strain on the liner connection. With the liner firmly in place, use a sharp razor knife to 
cut the spillway opening in the liner using the inside of the spillway as a guide (Figure 9).

Figure 9.

Summary of Contents for BF1900

Page 1: ...Instruction Manual 1 877 80 PONDS www atlanticwatergardens com...

Page 2: ...mp Vault Page 10 FASTFALLS INSTALLATION Setting the FastFalls Page 11 Liner and Plumbing Attachment Page 11 Hiding the FastFalls Page 12 PRO SERIES ACCESSORIES Bottom Drain Kit Page 12 Back Flush Kit...

Page 3: ...ottom reservoir to the top of the waterfall and or streambed The water must then fill from top to bottom the waterfalls and streambed until it eventually re enters the pond and the water levels equali...

Page 4: ...reambed and enables the system to function optimally Transitional water is determined by the height that the weir rock extends above the liner at the spillway opening Maintaining the shortest distance...

Page 5: ...top of the weir door opening and even with the water level indicator molded on the side of the Skimmer PS15000 only Make sure that any unexcavated soil that is left in front of the Skimmer is at least...

Page 6: ...fasten the top corners using two of the supplied 1 4 20 machine screws and serrated flange nuts Next install two screws in the bottom corners of the weir door frame Once you have the weir door tacked...

Page 7: ...choose which panel of the FilterFalls to enter Drill points have been provided to indicate the proper height to drill for the bulkhead fitting Information has been provided below to show which bulkhe...

Page 8: ...ulkhead until tight Use PVC Glue not included to glue the PVC flex hose into the MTA Do not completely backfill the FilterFalls until all of your plumbing connections are made and the liner has been a...

Page 9: ...can hold before you begin construction of the waterfalls or streambed Why should the basin be three times the size of the stream Upon start up the pump sends water from the bottom reservoir to the top...

Page 10: ...tall underlayment pond liner properly oriented Eco Blox and Pump Vault Backfill the space between the Eco Blox Pump Vault and the excavation to lock them into place either outside the liner with sand...

Page 11: ...ase Place the FastFalls on top of the liner in its original position Check the unit for level to ensure that nothing has changed Once the FastFalls is level and positioned correctly place a couple of...

Page 12: ...ed lip will keep the gravel or soil from washing into the water Pro Series Accessories BOTTOM DRAIN KIT The BD2000 Bottom Drain Kit contains all the necessary fittings to properly install a bottom dra...

Page 13: ...en onto the 2 threaded street 90 and place the screen in its desired location Measure for the correct length of pipe to join the 90 to the MTA that you installed in the pond side of the bulkhead Cut a...

Page 14: ...e hole 21 2 up will position the bulkhead as low as possible Install the bottom drain bulkhead and follow the plumbing diagram below to complete the installation Note Three stage matala filter kits ar...

Page 15: ...ponding Skimmer Pump Vault Use of this equipment combination is not recommended and could void the warranty The discharge pipe can be extended with the 2 PVC pipe and a coupling for use with the large...

Page 16: ...en the retaining nut Figure 23 Fittings to connect the Auto Fill to a garden hose irrigation line and Sch40 PVC are included in the kit Wrap the male threads on the Auto Fill with thread sealant and i...

Reviews: