Atlantic BF1900 Instruction Manual Download Page 6

6

   When you are satisfied with the position of the 
liner, clip it in place with the provided spring clips.  
With a sharp razor knife, cut a hole in the liner for 
the weir door using the hole in the face of the 
Skimmer as a guide.  When you are finished, 
remove the spring clips and pull the liner away from 
the face of the Skimmer.  Apply Atlantic’s fish-safe 
RTV Silicone Sealant around the weir door opening 
on all four sides. (Figure 6.)  
   Apply the silicone in a consistent bead 
approximately ¾” away from the opening itself, 
directly on top of the bolt holes.  Once you are 
finished, you can return the liner to its original 
position and replace the spring clips.

Figure 6.

ATTACHING THE WEIR DOOR

   Unlatch the weir door and lower the door to its fully open position.  Insert the weir door 

assembly into the Skimmer opening and push the weir door frame tight against the 
Skimmer face. (Figure 7.)
   Line up the holes of the weir door frame with the holes in the Skimmer face.  Use a nail or 
an awl to help line up the holes and pierce the liner in the top corners.  Loosely fasten the 
top corners using two of the supplied 1/4-20 machine screws and serrated flange nuts.  Next, 
install two screws in the bottom corners of the weir door frame.  Once you have the weir door 
tacked at the corners, install the rest of the screws.  Do not fully tighten any screws until all of 
the screws have been installed.

Figure 7.

It is recommended that you install an AWG Check Valve Assembly between the pump and the 
outlet pipe.  The check valve will prevent the FilterFalls from draining when the pump is turned 
off.  There are drill-points provided on the sides of all Pro Series Skimmer models to show the 
proper location for the installation of an AF1000 Auto Fill valve (not included).  See the Auto 
Fill installation instructions for more information. There are also drill-points provided on the 
back of all Pro Series Skimmer models to show the proper location and elevation for the 
installation of an overflow (not included).

Use your fingers to hold the flange nut and a hand held screwdriver to tighten the 
screws. The serrations on the flange nut will grab the plastic enclosure once it makes 
contact, eliminating the need to use a wrench. Use caution when tightening the 
screws. The screws need only be snug for the silicone to make a seal. 

Summary of Contents for BF1900

Page 1: ...Instruction Manual 1 877 80 PONDS www atlanticwatergardens com...

Page 2: ...mp Vault Page 10 FASTFALLS INSTALLATION Setting the FastFalls Page 11 Liner and Plumbing Attachment Page 11 Hiding the FastFalls Page 12 PRO SERIES ACCESSORIES Bottom Drain Kit Page 12 Back Flush Kit...

Page 3: ...ottom reservoir to the top of the waterfall and or streambed The water must then fill from top to bottom the waterfalls and streambed until it eventually re enters the pond and the water levels equali...

Page 4: ...reambed and enables the system to function optimally Transitional water is determined by the height that the weir rock extends above the liner at the spillway opening Maintaining the shortest distance...

Page 5: ...top of the weir door opening and even with the water level indicator molded on the side of the Skimmer PS15000 only Make sure that any unexcavated soil that is left in front of the Skimmer is at least...

Page 6: ...fasten the top corners using two of the supplied 1 4 20 machine screws and serrated flange nuts Next install two screws in the bottom corners of the weir door frame Once you have the weir door tacked...

Page 7: ...choose which panel of the FilterFalls to enter Drill points have been provided to indicate the proper height to drill for the bulkhead fitting Information has been provided below to show which bulkhe...

Page 8: ...ulkhead until tight Use PVC Glue not included to glue the PVC flex hose into the MTA Do not completely backfill the FilterFalls until all of your plumbing connections are made and the liner has been a...

Page 9: ...can hold before you begin construction of the waterfalls or streambed Why should the basin be three times the size of the stream Upon start up the pump sends water from the bottom reservoir to the top...

Page 10: ...tall underlayment pond liner properly oriented Eco Blox and Pump Vault Backfill the space between the Eco Blox Pump Vault and the excavation to lock them into place either outside the liner with sand...

Page 11: ...ase Place the FastFalls on top of the liner in its original position Check the unit for level to ensure that nothing has changed Once the FastFalls is level and positioned correctly place a couple of...

Page 12: ...ed lip will keep the gravel or soil from washing into the water Pro Series Accessories BOTTOM DRAIN KIT The BD2000 Bottom Drain Kit contains all the necessary fittings to properly install a bottom dra...

Page 13: ...en onto the 2 threaded street 90 and place the screen in its desired location Measure for the correct length of pipe to join the 90 to the MTA that you installed in the pond side of the bulkhead Cut a...

Page 14: ...e hole 21 2 up will position the bulkhead as low as possible Install the bottom drain bulkhead and follow the plumbing diagram below to complete the installation Note Three stage matala filter kits ar...

Page 15: ...ponding Skimmer Pump Vault Use of this equipment combination is not recommended and could void the warranty The discharge pipe can be extended with the 2 PVC pipe and a coupling for use with the large...

Page 16: ...en the retaining nut Figure 23 Fittings to connect the Auto Fill to a garden hose irrigation line and Sch40 PVC are included in the kit Wrap the male threads on the Auto Fill with thread sealant and i...

Reviews: