Pro Series Skimmer Installation

EXCAVATING AND SETTING THE SKIMMER

  Prior to setting the skimmer you must first determine the surface level of the water in the 
pond. Once you have this number you can excavate for the Skimmer. The excavation should 
be a few inches wider and longer than the Skimmer body. Find your model number below to 
determine the approximate depth of the hole.

   Do not dig too deep

. The skimmer should be set on undisturbed earth if possible. In the 

case that you over-dig, be sure to compact the soil thoroughly to prevent settling. The bottom 
of the hole should be level side-to-side and front-to-back.

16 - 17” 

PS4600

18 - 19” 

PS7000

24 - 25” 

PS15000

Figure 5.

WATER 

LINE 

WATER LEVEL

10” 

MIN

1 ¼” -1 ½”

   Place the Skimmer enclosure into the excavated hole.  Check the top of the enclosure to 
make sure that it is level front-to-back and side-to-side.  Check where your pre-determined 
water level falls on the face of the Skimmer enclosure.  The water level needs to be between 
1¼” and 1 ½” below the top of the weir door opening and even with the water level indicator 
molded on the side of the Skimmer. (PS15000 only)
   Make sure that any unexcavated soil that is left in front of the Skimmer is at least 10” below 
water level (See Figure 5). This will ensure that there is enough room for the weir door to be 
installed and function properly.
   Before you go any further into the Skimmer installation, place a few stones inside the 
Skimmer enclosure to weigh it down and keep it from moving. Install the solid support bar(s) 
and begin backfilling.  The support bar(s) must be in place for the enclosure to retain its shape 
during the backfilling process. Loosely backfill the enclosure on all sides, lightly compacting as 
you go. Do not over-compact the soil.  Aggressive compaction may deform the enclosure and 
cause components to fit improperly.

ATTACHING THE LINER

Hold the liner up against the face of the Skimmer, allowing a minimum of 2” to extend above 
the top of the enclosure.  Leave some slack in the liner below the weir opening.  This will help 
avoid any future strain on the liner connection.  
   Make sure that the front surface of the Skimmer and the back side of the liner are clean and 
free of debris.  

Summary of Contents for BF1900

Page 1: ...Instruction Manual 1 877 80 PONDS www atlanticwatergardens com...

Page 2: ...mp Vault Page 10 FASTFALLS INSTALLATION Setting the FastFalls Page 11 Liner and Plumbing Attachment Page 11 Hiding the FastFalls Page 12 PRO SERIES ACCESSORIES Bottom Drain Kit Page 12 Back Flush Kit...

Page 3: ...ottom reservoir to the top of the waterfall and or streambed The water must then fill from top to bottom the waterfalls and streambed until it eventually re enters the pond and the water levels equali...

Page 4: ...reambed and enables the system to function optimally Transitional water is determined by the height that the weir rock extends above the liner at the spillway opening Maintaining the shortest distance...

Page 5: ...top of the weir door opening and even with the water level indicator molded on the side of the Skimmer PS15000 only Make sure that any unexcavated soil that is left in front of the Skimmer is at least...

Page 6: ...fasten the top corners using two of the supplied 1 4 20 machine screws and serrated flange nuts Next install two screws in the bottom corners of the weir door frame Once you have the weir door tacked...

Page 7: ...choose which panel of the FilterFalls to enter Drill points have been provided to indicate the proper height to drill for the bulkhead fitting Information has been provided below to show which bulkhe...

Page 8: ...ulkhead until tight Use PVC Glue not included to glue the PVC flex hose into the MTA Do not completely backfill the FilterFalls until all of your plumbing connections are made and the liner has been a...

Page 9: ...can hold before you begin construction of the waterfalls or streambed Why should the basin be three times the size of the stream Upon start up the pump sends water from the bottom reservoir to the top...

Page 10: ...tall underlayment pond liner properly oriented Eco Blox and Pump Vault Backfill the space between the Eco Blox Pump Vault and the excavation to lock them into place either outside the liner with sand...

Page 11: ...ase Place the FastFalls on top of the liner in its original position Check the unit for level to ensure that nothing has changed Once the FastFalls is level and positioned correctly place a couple of...

Page 12: ...ed lip will keep the gravel or soil from washing into the water Pro Series Accessories BOTTOM DRAIN KIT The BD2000 Bottom Drain Kit contains all the necessary fittings to properly install a bottom dra...

Page 13: ...en onto the 2 threaded street 90 and place the screen in its desired location Measure for the correct length of pipe to join the 90 to the MTA that you installed in the pond side of the bulkhead Cut a...

Page 14: ...e hole 21 2 up will position the bulkhead as low as possible Install the bottom drain bulkhead and follow the plumbing diagram below to complete the installation Note Three stage matala filter kits ar...

Page 15: ...ponding Skimmer Pump Vault Use of this equipment combination is not recommended and could void the warranty The discharge pipe can be extended with the 2 PVC pipe and a coupling for use with the large...

Page 16: ...en the retaining nut Figure 23 Fittings to connect the Auto Fill to a garden hose irrigation line and Sch40 PVC are included in the kit Wrap the male threads on the Auto Fill with thread sealant and i...

Reviews: