Atlantic BF1900 Instruction Manual Download Page 16

16

  Place the TidalWave pump with installed Triton Check Valve into the Pro Series Skimmer. Connect 
the outlet fitting of the Triton Check Valve to the PVC supply line that feeds the waterfall using PVC 
glue and cleaner. For your convenience; 2” and 1 ½” outlet fittings are supplied with the Triton 
Check Valve.
  Complete installation by tightening the union nuts on the Triton Check Valve. Hand tighten only. Do 
not use channel locks to tighten the union nuts.

AF1000 AUTO FILL KIT

 

  Drill points have been provided for the 
proper Auto Fill location on either side of the 
Pro Series Skimmer and Pump Vault (Figure 
22).

 

It is a good idea to completely install the 

pump, check valve assembly, and discharge 
hose before you drill for the Auto Fill. This will 
help you determine the best side of the 
Skimmer or Pump Vault to place the Auto Fill 
so that it has proper clearance on all sides.
   Once you have determined the location of 
the Auto Fill, drill a 

7/8”

 hole using a spade bit 

or hole saw. Insert the Auto Fill making sure 
the gasket is on the inside of the enclosure 
and the plastic retaining nut is on the outside. 
Tighten the retaining nut until snug. Do not 
over-tighten the retaining nut (Figure 23).
      Fittings to connect the Auto Fill to a 
garden hose, ½” irrigation line, and ½” Sch40 
PVC are included in the kit. Wrap the ½” male 
threads on the Auto Fill with thread sealant 
and install the fitting of your choice. Once 
water is supplied to the Auto Fill it will 
maintain the set water level by automatically 
adding water when the level drops. This level 
can be adjusted by loosening the wing nut and raising and lowering the height of the Auto Fill 
float. Use the water line mark on the weir door frame to help establish proper water level.

VALVE

GASKET

RETAINING 

NUT

FITTING

Figure 23.

Figure 22.

OVERFLOW

  A drill-point has been provided on the back of the

 

Pro Series Skimmer and Pump Vaults to 

show the proper location and elevation to install an Atlantic HA2000 bulkhead fitting and 2” 
MTA for the overflow (not included). This combination will position the bottom of the overflow 
pipe approximately 1” above recommended water level. (Note: If a HA2000 bulkhead is not 
being used, the center point for the hole will have to be recalculated on site.)

   

Drill a 3” hole and install the bulkhead following the instructions on

 

page 7.

 

Install a 2” MTA 

and connect the overflow pipe.  Apply silicone on the threads of the Male Thread Adaptor 
(MTA). Screw the MTA into the bulkhead until tight. Use PVC Glue (not included) to glue the 
PVC flex hose into the MTA.

Summary of Contents for BF1900

Page 1: ...Instruction Manual 1 877 80 PONDS www atlanticwatergardens com...

Page 2: ...mp Vault Page 10 FASTFALLS INSTALLATION Setting the FastFalls Page 11 Liner and Plumbing Attachment Page 11 Hiding the FastFalls Page 12 PRO SERIES ACCESSORIES Bottom Drain Kit Page 12 Back Flush Kit...

Page 3: ...ottom reservoir to the top of the waterfall and or streambed The water must then fill from top to bottom the waterfalls and streambed until it eventually re enters the pond and the water levels equali...

Page 4: ...reambed and enables the system to function optimally Transitional water is determined by the height that the weir rock extends above the liner at the spillway opening Maintaining the shortest distance...

Page 5: ...top of the weir door opening and even with the water level indicator molded on the side of the Skimmer PS15000 only Make sure that any unexcavated soil that is left in front of the Skimmer is at least...

Page 6: ...fasten the top corners using two of the supplied 1 4 20 machine screws and serrated flange nuts Next install two screws in the bottom corners of the weir door frame Once you have the weir door tacked...

Page 7: ...choose which panel of the FilterFalls to enter Drill points have been provided to indicate the proper height to drill for the bulkhead fitting Information has been provided below to show which bulkhe...

Page 8: ...ulkhead until tight Use PVC Glue not included to glue the PVC flex hose into the MTA Do not completely backfill the FilterFalls until all of your plumbing connections are made and the liner has been a...

Page 9: ...can hold before you begin construction of the waterfalls or streambed Why should the basin be three times the size of the stream Upon start up the pump sends water from the bottom reservoir to the top...

Page 10: ...tall underlayment pond liner properly oriented Eco Blox and Pump Vault Backfill the space between the Eco Blox Pump Vault and the excavation to lock them into place either outside the liner with sand...

Page 11: ...ase Place the FastFalls on top of the liner in its original position Check the unit for level to ensure that nothing has changed Once the FastFalls is level and positioned correctly place a couple of...

Page 12: ...ed lip will keep the gravel or soil from washing into the water Pro Series Accessories BOTTOM DRAIN KIT The BD2000 Bottom Drain Kit contains all the necessary fittings to properly install a bottom dra...

Page 13: ...en onto the 2 threaded street 90 and place the screen in its desired location Measure for the correct length of pipe to join the 90 to the MTA that you installed in the pond side of the bulkhead Cut a...

Page 14: ...e hole 21 2 up will position the bulkhead as low as possible Install the bottom drain bulkhead and follow the plumbing diagram below to complete the installation Note Three stage matala filter kits ar...

Page 15: ...ponding Skimmer Pump Vault Use of this equipment combination is not recommended and could void the warranty The discharge pipe can be extended with the 2 PVC pipe and a coupling for use with the large...

Page 16: ...en the retaining nut Figure 23 Fittings to connect the Auto Fill to a garden hose irrigation line and Sch40 PVC are included in the kit Wrap the male threads on the Auto Fill with thread sealant and i...

Reviews: