Atlantic BF1900 Instruction Manual Download Page 12

12

   

Figure 16.

Tighten flange screws with a hand held screwdriver only. Over tightening the screws 
could strip out the inserts or crack the liner flange. The screws need only to be snug 
for the silicone to make a seal.

  Apply silicone on the threads of the Male Thread Adaptor (MTA). Screw the MTA into the 
spinweld until tight. Use PVC Glue (not included) to glue the PVC flex hose into the MTA.

   

Figure 17.

HIDING THE FASTFALLS

  Position rocks on either side of the Pro Series 
FastFalls, inside the liner. Start working 
the rock in and around the front of the 
FastFalls, building up to the lip of the 
FastFalls, which will provide support 
for a lip rock. The Fastfalls will support 
the weight of gravel and rocks stacked 
directly on top of the unit. The FastFalls 
easily supports the weight, so consider 
covering the whole unit with a single 
sizeable overhanging capstone, or stack 
individual smaller stones and gravel on 
top to completely conceal the FastFalls 
(Figure 17). For a ‘grown-in’ look, cover 
the FastFalls with soil and plant small evergreens and perennials right on top.  The raised 
lip will keep the gravel or soil from washing into the water.

Pro Series Accessories

BOTTOM DRAIN KIT

 

The BD2000 Bottom Drain Kit contains all the necessary fittings to properly install a bottom 
drain. 2” flexible PVC pipe must be furnished by the end user to complete installation.
   The bottom drain should be installed in the lowest point of the water garden. When  
installing a bottom drain in a new pond it is helpful to dig a 4” deep trench from where the 
bottom drain pipe will enter the pond to the intake screen location. The liner can then be 
installed and depressed into the trench. The bottom drain pipe can then be nestled in that 
depression and easily camouflaged with gravel and stone.
   Drill-points have been provided on all compatible Skimmer models to show the proper 
location for the bulkhead fitting. See Figure 18. Drill the hole with a 3” hole saw and install the 
bulkhead following the bulkhead installation instructions on

 

page 7. 

   Install a 2” MTA into the bulkhead on the outside of the Skimmer box. Be sure to wrap all 
threaded fittings with thread sealant. Next, glue a 2” elbow to one end of a 12” length of pipe 
and glue the other end into the MTA with the elbow turned toward the liner. (All pipe lengths 
may be adjusted to fit your particular application).

Summary of Contents for BF1900

Page 1: ...Instruction Manual 1 877 80 PONDS www atlanticwatergardens com...

Page 2: ...mp Vault Page 10 FASTFALLS INSTALLATION Setting the FastFalls Page 11 Liner and Plumbing Attachment Page 11 Hiding the FastFalls Page 12 PRO SERIES ACCESSORIES Bottom Drain Kit Page 12 Back Flush Kit...

Page 3: ...ottom reservoir to the top of the waterfall and or streambed The water must then fill from top to bottom the waterfalls and streambed until it eventually re enters the pond and the water levels equali...

Page 4: ...reambed and enables the system to function optimally Transitional water is determined by the height that the weir rock extends above the liner at the spillway opening Maintaining the shortest distance...

Page 5: ...top of the weir door opening and even with the water level indicator molded on the side of the Skimmer PS15000 only Make sure that any unexcavated soil that is left in front of the Skimmer is at least...

Page 6: ...fasten the top corners using two of the supplied 1 4 20 machine screws and serrated flange nuts Next install two screws in the bottom corners of the weir door frame Once you have the weir door tacked...

Page 7: ...choose which panel of the FilterFalls to enter Drill points have been provided to indicate the proper height to drill for the bulkhead fitting Information has been provided below to show which bulkhe...

Page 8: ...ulkhead until tight Use PVC Glue not included to glue the PVC flex hose into the MTA Do not completely backfill the FilterFalls until all of your plumbing connections are made and the liner has been a...

Page 9: ...can hold before you begin construction of the waterfalls or streambed Why should the basin be three times the size of the stream Upon start up the pump sends water from the bottom reservoir to the top...

Page 10: ...tall underlayment pond liner properly oriented Eco Blox and Pump Vault Backfill the space between the Eco Blox Pump Vault and the excavation to lock them into place either outside the liner with sand...

Page 11: ...ase Place the FastFalls on top of the liner in its original position Check the unit for level to ensure that nothing has changed Once the FastFalls is level and positioned correctly place a couple of...

Page 12: ...ed lip will keep the gravel or soil from washing into the water Pro Series Accessories BOTTOM DRAIN KIT The BD2000 Bottom Drain Kit contains all the necessary fittings to properly install a bottom dra...

Page 13: ...en onto the 2 threaded street 90 and place the screen in its desired location Measure for the correct length of pipe to join the 90 to the MTA that you installed in the pond side of the bulkhead Cut a...

Page 14: ...e hole 21 2 up will position the bulkhead as low as possible Install the bottom drain bulkhead and follow the plumbing diagram below to complete the installation Note Three stage matala filter kits ar...

Page 15: ...ponding Skimmer Pump Vault Use of this equipment combination is not recommended and could void the warranty The discharge pipe can be extended with the 2 PVC pipe and a coupling for use with the large...

Page 16: ...en the retaining nut Figure 23 Fittings to connect the Auto Fill to a garden hose irrigation line and Sch40 PVC are included in the kit Wrap the male threads on the Auto Fill with thread sealant and i...

Reviews: