Atlantic BF1900 Instruction Manual Download Page 11

11

SETTING THE FASTFALLS

  Place the Pro Series FastFalls on a level bed of undisturbed soil if possible, to avoid settling. 
If installing above existing grade, compact the area thoroughly. This critical step will ensure 
that the FastFalls will not settle out of level over time. Blocks or bricks set on virgin soil can 
also be used to raise the FastFalls while reducing the chance of settling. 
  Place the FastFalls right at the basin’s edge to create a single dramatic fall, or pull the 
FastFalls back from the edge to create a stream. Leave plenty of liner around the FastFalls to 
make it easy to camouflage with rock later. 
   To ensure a leak-proof installation, test place the FastFalls in the desired 
location and level it from side-to-side and front-to-back. The closed design of the FastFalls 
ensures that water will only exit the unit over the spillway, so there is no need to tilt the 
FastFalls forward. 

Pro Series FastFalls Installation

   

Figure 14.

  When you are satisfied with the 
placement of the FastFalls, remove the 
unit and install the liner and underlayment, 
being careful not to disturb the level base. 
Place the FastFalls on top of the liner in its 
original position. Check the unit for level to 
ensure that nothing has changed. Once the 
FastFalls is level and positioned correctly, 
place a couple of large stones on top of the 
FastFalls. This will ensure that the FastFalls does 
not move when backfilling and attaching liner (Figure 14).

LINER AND PLUMBING ATTACHMENT

 

  Hold the liner up against the flat panel on the back of the FastFalls enclosure. Leave some 
excess slack in the liner below the spinweld. This will help alleviate any future strain on the 
liner connection. Make sure the back surface of the FastFalls, and the back side of the liner is 
clean and free of debris. Once you are satisfied with the position of the liner, lower it down and 
prepare to apply the silicone sealant (Figure 15).

Figure 15.

   Apply Atlantic’s Silicone Sealant in a continuous, consistent bead along the center of the 
threaded inserts. Once completed, return the liner to its dry-fit position.
   Attach the supplied flange to the FastFalls, starting with the top screw first, working around 
the flange. If needed, use an awl or nail to pierce the liner before inserting the screws. Do not 
fully tighten any screws until all of the screws have been installed. Once completed, trim away 
the liner on the inside of the flange (Figure 16).

Summary of Contents for BF1900

Page 1: ...Instruction Manual 1 877 80 PONDS www atlanticwatergardens com...

Page 2: ...mp Vault Page 10 FASTFALLS INSTALLATION Setting the FastFalls Page 11 Liner and Plumbing Attachment Page 11 Hiding the FastFalls Page 12 PRO SERIES ACCESSORIES Bottom Drain Kit Page 12 Back Flush Kit...

Page 3: ...ottom reservoir to the top of the waterfall and or streambed The water must then fill from top to bottom the waterfalls and streambed until it eventually re enters the pond and the water levels equali...

Page 4: ...reambed and enables the system to function optimally Transitional water is determined by the height that the weir rock extends above the liner at the spillway opening Maintaining the shortest distance...

Page 5: ...top of the weir door opening and even with the water level indicator molded on the side of the Skimmer PS15000 only Make sure that any unexcavated soil that is left in front of the Skimmer is at least...

Page 6: ...fasten the top corners using two of the supplied 1 4 20 machine screws and serrated flange nuts Next install two screws in the bottom corners of the weir door frame Once you have the weir door tacked...

Page 7: ...choose which panel of the FilterFalls to enter Drill points have been provided to indicate the proper height to drill for the bulkhead fitting Information has been provided below to show which bulkhe...

Page 8: ...ulkhead until tight Use PVC Glue not included to glue the PVC flex hose into the MTA Do not completely backfill the FilterFalls until all of your plumbing connections are made and the liner has been a...

Page 9: ...can hold before you begin construction of the waterfalls or streambed Why should the basin be three times the size of the stream Upon start up the pump sends water from the bottom reservoir to the top...

Page 10: ...tall underlayment pond liner properly oriented Eco Blox and Pump Vault Backfill the space between the Eco Blox Pump Vault and the excavation to lock them into place either outside the liner with sand...

Page 11: ...ase Place the FastFalls on top of the liner in its original position Check the unit for level to ensure that nothing has changed Once the FastFalls is level and positioned correctly place a couple of...

Page 12: ...ed lip will keep the gravel or soil from washing into the water Pro Series Accessories BOTTOM DRAIN KIT The BD2000 Bottom Drain Kit contains all the necessary fittings to properly install a bottom dra...

Page 13: ...en onto the 2 threaded street 90 and place the screen in its desired location Measure for the correct length of pipe to join the 90 to the MTA that you installed in the pond side of the bulkhead Cut a...

Page 14: ...e hole 21 2 up will position the bulkhead as low as possible Install the bottom drain bulkhead and follow the plumbing diagram below to complete the installation Note Three stage matala filter kits ar...

Page 15: ...ponding Skimmer Pump Vault Use of this equipment combination is not recommended and could void the warranty The discharge pipe can be extended with the 2 PVC pipe and a coupling for use with the large...

Page 16: ...en the retaining nut Figure 23 Fittings to connect the Auto Fill to a garden hose irrigation line and Sch40 PVC are included in the kit Wrap the male threads on the Auto Fill with thread sealant and i...