EXCAVATING AND SETTING THE PUMP VAULT

 Once you have determined a proper sized basin for your project, begin by deciding the 
placement of the vault.  The vault should be placed away from the waterfall where the lid can 
be accessed easily.  Excavate the entire area of the basin to a depth of 18”.  This will 
accommodate one layer of Eco-Blox.  The area where the pump vault will sit should be dug 
deeper to provide a sump area for the pump to sit, ensuring the pump 
will remain completely submersed.  If using a PV1800, dig this area 
to a depth of 22”, and for a PV2300, a depth of 28”.

Pro Series Pump Vault Installation

For installations where a larger basin volume or deeper basin is required, Atlantic offers pump vault 
extensions for both the PV1800 and PV2300.  Each extension will add the 
height of one Eco-Blox.  For each additional Eco-Blox layer, 
increase the depth of your excavation by 17”.

Once excavation is complete, install underlayment, 
pond liner, properly oriented Eco-Blox and Pump 
Vault.  Backfill the space between the Eco-Blox/ 
Pump Vault and the excavation to lock them into 
place, either outside the liner with sand or clean 
fill, or inside the liner with gravel ¾” or larger in 
diameter.  Top the liner and basin with ¾”  or 
larger gravel or decorative stone.

Figure 11.

Figure 12.

PLUMBING THE PUMP VAULT

Atlantic’s Pro Series Pump Vaults do not come pre-drilled 
for the pump outlet.  Not having a pre-drilled pump outlet 
gives the professional installer the flexibility to choose 
which side of the enclosure to exit and with what size pipe.  
Drill points and cut lines have been provided for 2” and 
3” flex PVC.  Two panels at the top have been left flat for 
custom plumbing applications as well as the installation of 
an AF1000 Auto Fill and/or overflow.  Recessed areas and 
cut lines for 4” and 6” SDR35 have been provided on two 
bottom panels.  Pipe extensions can be added to increase 
the flow of water into the vault and also increase the ability 
to channel debris into the vault.

2” & 3” 

cutlines

4” & 6” 

SDR35

FLAT PANELS 

FOR CUSTOM 

PLUMBING

Figure 13.

Summary of Contents for BF1900

Page 1: ...Instruction Manual 1 877 80 PONDS www atlanticwatergardens com...

Page 2: ...mp Vault Page 10 FASTFALLS INSTALLATION Setting the FastFalls Page 11 Liner and Plumbing Attachment Page 11 Hiding the FastFalls Page 12 PRO SERIES ACCESSORIES Bottom Drain Kit Page 12 Back Flush Kit...

Page 3: ...ottom reservoir to the top of the waterfall and or streambed The water must then fill from top to bottom the waterfalls and streambed until it eventually re enters the pond and the water levels equali...

Page 4: ...reambed and enables the system to function optimally Transitional water is determined by the height that the weir rock extends above the liner at the spillway opening Maintaining the shortest distance...

Page 5: ...top of the weir door opening and even with the water level indicator molded on the side of the Skimmer PS15000 only Make sure that any unexcavated soil that is left in front of the Skimmer is at least...

Page 6: ...fasten the top corners using two of the supplied 1 4 20 machine screws and serrated flange nuts Next install two screws in the bottom corners of the weir door frame Once you have the weir door tacked...

Page 7: ...choose which panel of the FilterFalls to enter Drill points have been provided to indicate the proper height to drill for the bulkhead fitting Information has been provided below to show which bulkhe...

Page 8: ...ulkhead until tight Use PVC Glue not included to glue the PVC flex hose into the MTA Do not completely backfill the FilterFalls until all of your plumbing connections are made and the liner has been a...

Page 9: ...can hold before you begin construction of the waterfalls or streambed Why should the basin be three times the size of the stream Upon start up the pump sends water from the bottom reservoir to the top...

Page 10: ...tall underlayment pond liner properly oriented Eco Blox and Pump Vault Backfill the space between the Eco Blox Pump Vault and the excavation to lock them into place either outside the liner with sand...

Page 11: ...ase Place the FastFalls on top of the liner in its original position Check the unit for level to ensure that nothing has changed Once the FastFalls is level and positioned correctly place a couple of...

Page 12: ...ed lip will keep the gravel or soil from washing into the water Pro Series Accessories BOTTOM DRAIN KIT The BD2000 Bottom Drain Kit contains all the necessary fittings to properly install a bottom dra...

Page 13: ...en onto the 2 threaded street 90 and place the screen in its desired location Measure for the correct length of pipe to join the 90 to the MTA that you installed in the pond side of the bulkhead Cut a...

Page 14: ...e hole 21 2 up will position the bulkhead as low as possible Install the bottom drain bulkhead and follow the plumbing diagram below to complete the installation Note Three stage matala filter kits ar...

Page 15: ...ponding Skimmer Pump Vault Use of this equipment combination is not recommended and could void the warranty The discharge pipe can be extended with the 2 PVC pipe and a coupling for use with the large...

Page 16: ...en the retaining nut Figure 23 Fittings to connect the Auto Fill to a garden hose irrigation line and Sch40 PVC are included in the kit Wrap the male threads on the Auto Fill with thread sealant and i...

Reviews: