Manual, Tool Changer, QC-110
Document #9620-20-B-110 Series Base Tool Changer-26
Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 •
B-10
2.5 Tool Plate Installation
Tools required: 8 mm hex key, toque wrench
Supplies required: Clean rag, Loctite 242
1. Clean the mounting surfaces.
2. If required, install the tooling interface plate to the customer tooling, align using the boss or dowel pins
and secure with customer supplied fasteners.
3. Align the dowel pins to the corresponding holes in the Tool plate and secure the Tool plate to the tool
interface plate or customer tooling with customer supplied (6) M10 socket head cap screws. Apply
Loctite 242 to threads (see
NOTICE:
If an ATI tool interface plate is used, fasteners to mount the Tool plate to the tool
interface plate may be supplied with the tool interface plate. The fasteners to mount the tool
interface plate or the Tool plate directly to the customer tooling is customer supplied.
4. Connect utilities to the appropriate module and Tool plate connections.
Figure 2.2—Standard Tool Plate Installation
Tool Plate
Dowel Pins (Customer Supplied)
Tool Interface Plate
(Customer Supplied)
(If required)
M10-1.5 Socket Head Cap Screws
(Customer Supplied)
2.6 Tool Plate Removal
Tools required: 8 mm hex key
1. Place the Tool in a secure location.
2. Uncouple the Master and Tool plates.
3. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.).
4. Disconnect the utilities from the Tool plate and attached modules.
5. Remove the fasteners connecting the Tool plate to the tooling or tool interface plate.