
126
working life, limit any problems that may arise and reduce the running costs of
the machine.
Comply with the following instructions:
•
Charge the battery in ventilated areas.
•
Keep open flames well away from the battery since explosive gases may
form.
•
Do not make temporary electrical connection that fail to comply with the
regulations in force.
•
Do not place tools or any other metal object on the battery.
•
Clean any encrustations from the battery terminals and always tighten
them correctly.
•
Always keep the battery clean, dry and free from oxidation.
•
If the battery is replaced, always comply with the instructions supplied
with it.
6.2.9.2
Maintenance
The batteries chosen by ALMAC S.r.l. and installed on all models are of the
“
maintenance-free
”
type. These batteries feature construction technology that
reduces water consumption to a considerable extent and maintains the
electrolyte for the entire life cycle of the batteries themselves.
6.2.9.3
Recharging
Recharge the battery only in ventilated areas.
Warning: when charging, gas develops that in certain conditions can create
EXPLOSIVE ATMOSPHERES.
Always recharge batteries in well ventilated places that conform to standards EN
60079-10 (IEC 31-30), where there is no risk of fire outbreaks and where suitable
extinguishers are ready to hand.
6.2.9.3.1 Charging method No. 1 with 12V battery charger
Summary of Contents for 1090 EVO
Page 7: ...7...
Page 22: ...22...
Page 23: ...23...
Page 49: ...49 37 Combustion engine 38 Fuel tank 39 Bi levelling chassis 37 38...
Page 78: ...78...
Page 80: ...80...
Page 122: ...122 In this configuration the oil level must be as shown in the figure below A 60mm...
Page 144: ...144...
Page 145: ...145...
Page 146: ...146...
Page 147: ...147...
Page 148: ...148...
Page 149: ...149...
Page 150: ...150...
Page 151: ...151...
Page 152: ...152...
Page 161: ...161 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 163: ...163 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 177: ...177 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...