11/16
3.4 Connection to the supply
It is recommended that the unit is first connected to the mains / transformer before entering
the explosion-hazardous area. Potential equalization should be arranged by the operator prior
entering explosion hazardous area.
Slam®Hornet-units with 2-pole supply (without bonding connection) can be taken to explosion
hazardous area without connecting it to the supply first.
3.4.1 Requirements for supply (electricity)
The following main requirements should be taken into account:
Supply voltage
: Variation may be maximum +/- 6% from the value stated in the unit type
label.
Current
: Maximum current of the system is 16 A.
Frequency
: Standard 50 Hz if not otherwise stated in the type label.
Fuse protection
: The supply has a fuse with a breaking capacity of at least 1500 A
Earth Leakage Circuit Breaker (ELCB):
It is recommended to use a supply with 30 mA
ELCB.
Please observe the type label for further data. Luminaires for 110 VAC or 230 V supply are to
be connected to a supply incorporating protective earth conductor.
3.5 Adding accessories to Slam® Hornet
Atexor provides a number of different accessories but in case you afterwards want to add
accessories of your own for the Slam®Hornet
–unit, please note the following points:
1. The user is fully responsible for the use of the equipment including service and maintenance
2. In case of adding accessories the following is mandatory
a. The construction of the certified unit shall not change
b. The IP
–class of the unit shall not decrease
3. The static electricity is taken account (e.g. electrostatic bonding)
In case you do not want to do your own risk assessment for the accessories please
view the whole range of accessories at