background image

11/16 

 

 

 

3.4 Connection to the supply 

 
It is recommended that  the unit is first  connected to the mains /  transformer before entering 
the explosion-hazardous area. Potential equalization should be arranged by the operator prior 
entering explosion hazardous area. 
 
Slam®Hornet-units with 2-pole supply (without bonding connection) can be taken to explosion 
hazardous area without connecting it to the supply first. 

 

3.4.1 Requirements for supply (electricity) 

 
The following main requirements should be taken into account: 
 

Supply  voltage

:  Variation  may  be  maximum  +/-  6%  from  the  value  stated  in  the  unit  type 

label. 

Current

: Maximum current of the system is 16 A. 

Frequency

: Standard 50 Hz if not otherwise stated in the type label. 

Fuse protection

: The supply has a fuse with a breaking capacity of at least 1500 A 

Earth  Leakage  Circuit  Breaker  (ELCB): 

It  is  recommended  to  use  a  supply  with  30  mA 

ELCB. 
 
Please observe the type label for further data. Luminaires for 110 VAC or 230 V supply are to 
be connected to a supply incorporating protective earth conductor. 
 

3.5 Adding accessories to Slam® Hornet 

 
Atexor  provides  a  number  of  different  accessories  but  in  case  you  afterwards  want  to  add 
accessories of your own for the Slam®Hornet 

–unit, please note the following points: 

 

1.  The user is fully responsible for the use of the equipment including service and maintenance 

 

2.  In case of adding accessories the following is mandatory 

 

a.  The construction of the certified unit shall not change 
b.  The IP 

–class of the unit shall not decrease 

 

3.  The static electricity is taken account (e.g. electrostatic bonding) 

 

In  case  you  do  not  want  to  do  your  own  risk  assessment  for  the  accessories  please 
view the whole range of accessories at

 

http://www.atexor.com

 

 
 

Summary of Contents for Slam Hornet 1 LED A

Page 1: ...08 ATEX 066 or IECEx VTT 12 0009 Thank you for choosing Slam Hornet portable work light for your job site Purpose of this manual is to provide you all the necessary safety and product information to...

Page 2: ...IA IIB or IIC in accordance with Equipment group IIA IIB or IIC 8 2 1 4 Temperature class of the equipment 9 2 1 5 Environmental criteria 9 3 Operating instructions 10 3 1 Personnel 10 3 2 Visual Insp...

Page 3: ...et 2 LED Slam Hornet Linear 2x18W Slam Hornet Linear 2x36W Slam Hornet Linear 2 LED Dimensions mm Product model L Slam Hornet 1x18W 335 115 Slam Hornet 1x36W A Slam Hornet 1 LED A 540 115 Slam Hornet...

Page 4: ...sion hazardous GASES D Certification taking account explosion hazardous DUSTS Explanation of marking for explosion hazardous area due to Gases e g Ex emb IIC T3 Gb Ex Certified for use in explosion ha...

Page 5: ...ation or during expected malfunctions 1 3 Standard unit construction The following list familiarizes you with some common unit features important to recognize End parts Flexible plastic made end parts...

Page 6: ...nts of own Socket Optional in built sockets receptacles for linking the Slam Hornet units in series apart from CSH118 Other common accessories Antistatic protective film for PC tube against chemical s...

Page 7: ...5 ohm High voltage test electrical strength The purpose of this test is to measure leakage current trough insulation Vital test for revealing broken components or similar failures which can not be ide...

Page 8: ...t category For explosion hazardous areas there are three equipment categories Category 1 product is suitable for use in Zones 0 1 and 2 20 21 and 22 Category 2 product is suitable for use in Zones 1 a...

Page 9: ...ntioned in this instruction are Temperature Class T4 GASES Slam units with fluorescent tube and LED modules mentioned in this instruction are having maximum surface temperature of 90 C DUSTS 2 1 5 Env...

Page 10: ...be used together with step down transformers Using Slam Hornet unit with transformers of 2 pole socket outlets without earthing bonding imposes certain extra requirements for the unit itself All the e...

Page 11: ...king capacity of at least 1500 A Earth Leakage Circuit Breaker ELCB It is recommended to use a supply with 30 mA ELCB Please observe the type label for further data Luminaires for 110 VAC or 230 V sup...

Page 12: ...is only for chaining Slam Hornet units 5 Fix them with accessories you have selected 6 Take the chain into Ex area Amount of lights which may be connected with each other depends on the supply voltage...

Page 13: ...net control gear protects itself against excessive voltage drops numerous linking by switching itself off If too many units are connected to the chain some units of the chain will switch off You may s...

Page 14: ...needed for measuring surface resistance of the PC tube 5 Maintenance instructions with exploded view diagram and spare parts list are available at your local distributor and the manufacturer Please wh...

Page 15: ...Gas Atmospheres Please observe the requirements of the valid standards of the day Please study at least the following standards EN IEC 60079 14 Electrical installations in hazardous areas EN IEC 60079...

Page 16: ...16 Helpdesk Under any doubt or question please contact your local distributor or the manufacturer Contact details Phone 358 20 734 3250 Fax 358 20 734 3299 Email info atexor com Web http www atexor c...

Reviews: