3.1 Personnel 

 
The  use  of  the  equipment  is  to  be  controlled  and  accepted  by  the  operator.  The  personnel 
using the unit have to be authorized by the operator or his representative. In case of further 
training of using the equipment please contact the local supplier of this equipment.  

 

3.2 Visual Inspection of Slam®Hornet 

 
As  for  all  equipment  to  be  used  inside  explosion  hazardous  area  it  is  recommended  that 
before taking the unit into Ex 

–area, at least a visual re-inspection on the unit was taken and 

an analysis made that the unit is un-damaged (e.g.  any part or wires are loose damaged or 
disconnected)  
 
In case faults or defects on the unit are noticed, it is prohibited to use the unit or to take such 
a unit into Ex 

–area until corrective actions have been made. 

 
 
 
 

3.3 Special Attention on 2-pole use (24 V or 42 V) 

 
Certain  Slam®Hornet  -units  are  designed  to  be  used  together  with  step-down  transformers. 
Using  Slam®Hornet  -unit  with  transformers  of  2-pole  socket  outlets  (without  earthing  / 
bonding)  imposes  certain  extra  requirements  for  the  unit  itself.  All  the  external  metal  and 
aluminium  parts  of  the  Slam®Hornet  are  replaced  by  the  manufacturer  with  plastic  parts  or 
equipped with plastic covers in order to avoid electrostatic charging and a consequent risk of 
explosion.  This  process  can  only  be  done  by  manufacturer  because  the  certification  of  the 
product.  
 
Please  inform  us  about  your  requirement  for  2-pole  use  when  placing  the  order.  Products 
originally manufactured for 3-pole use can not be modified later for 2-pole use by the operator. 
Such  modifications  are  only  allowed  to  be  carried  out  by  the  manufacturer  or  under 
supervision of the manufacturer. 
 
Note!  Lack  of  equipotential  bonding  may  cause  danger  in  Ex 

–area,  therefore  please  pay 

special  attention  to  all  installations  of  yours  involving  metallic  parts.  Static  charging  is 
especially  noted  on  standards  referring  to  installations  in  explosion  hazardous  areas  (e.g. 
EN/IEC 60079-14). 
 

Summary of Contents for Slam Hornet 1 LED A

Page 1: ...08 ATEX 066 or IECEx VTT 12 0009 Thank you for choosing Slam Hornet portable work light for your job site Purpose of this manual is to provide you all the necessary safety and product information to...

Page 2: ...IA IIB or IIC in accordance with Equipment group IIA IIB or IIC 8 2 1 4 Temperature class of the equipment 9 2 1 5 Environmental criteria 9 3 Operating instructions 10 3 1 Personnel 10 3 2 Visual Insp...

Page 3: ...et 2 LED Slam Hornet Linear 2x18W Slam Hornet Linear 2x36W Slam Hornet Linear 2 LED Dimensions mm Product model L Slam Hornet 1x18W 335 115 Slam Hornet 1x36W A Slam Hornet 1 LED A 540 115 Slam Hornet...

Page 4: ...sion hazardous GASES D Certification taking account explosion hazardous DUSTS Explanation of marking for explosion hazardous area due to Gases e g Ex emb IIC T3 Gb Ex Certified for use in explosion ha...

Page 5: ...ation or during expected malfunctions 1 3 Standard unit construction The following list familiarizes you with some common unit features important to recognize End parts Flexible plastic made end parts...

Page 6: ...nts of own Socket Optional in built sockets receptacles for linking the Slam Hornet units in series apart from CSH118 Other common accessories Antistatic protective film for PC tube against chemical s...

Page 7: ...5 ohm High voltage test electrical strength The purpose of this test is to measure leakage current trough insulation Vital test for revealing broken components or similar failures which can not be ide...

Page 8: ...t category For explosion hazardous areas there are three equipment categories Category 1 product is suitable for use in Zones 0 1 and 2 20 21 and 22 Category 2 product is suitable for use in Zones 1 a...

Page 9: ...ntioned in this instruction are Temperature Class T4 GASES Slam units with fluorescent tube and LED modules mentioned in this instruction are having maximum surface temperature of 90 C DUSTS 2 1 5 Env...

Page 10: ...be used together with step down transformers Using Slam Hornet unit with transformers of 2 pole socket outlets without earthing bonding imposes certain extra requirements for the unit itself All the e...

Page 11: ...king capacity of at least 1500 A Earth Leakage Circuit Breaker ELCB It is recommended to use a supply with 30 mA ELCB Please observe the type label for further data Luminaires for 110 VAC or 230 V sup...

Page 12: ...is only for chaining Slam Hornet units 5 Fix them with accessories you have selected 6 Take the chain into Ex area Amount of lights which may be connected with each other depends on the supply voltage...

Page 13: ...net control gear protects itself against excessive voltage drops numerous linking by switching itself off If too many units are connected to the chain some units of the chain will switch off You may s...

Page 14: ...needed for measuring surface resistance of the PC tube 5 Maintenance instructions with exploded view diagram and spare parts list are available at your local distributor and the manufacturer Please wh...

Page 15: ...Gas Atmospheres Please observe the requirements of the valid standards of the day Please study at least the following standards EN IEC 60079 14 Electrical installations in hazardous areas EN IEC 60079...

Page 16: ...16 Helpdesk Under any doubt or question please contact your local distributor or the manufacturer Contact details Phone 358 20 734 3250 Fax 358 20 734 3299 Email info atexor com Web http www atexor c...

Reviews: