10/16
3.
Operating instructions
3.1 Personnel
The use of the equipment is to be controlled and accepted by the operator. The personnel
using the unit have to be authorized by the operator or his representative. In case of further
training of using the equipment please contact the local supplier of this equipment.
3.2 Visual Inspection of Slam®Hornet
As for all equipment to be used inside explosion hazardous area it is recommended that
before taking the unit into Ex
–area, at least a visual re-inspection on the unit was taken and
an analysis made that the unit is un-damaged (e.g. any part or wires are loose damaged or
disconnected)
In case faults or defects on the unit are noticed, it is prohibited to use the unit or to take such
a unit into Ex
–area until corrective actions have been made.
3.3 Special Attention on 2-pole use (24 V or 42 V)
Certain Slam®Hornet -units are designed to be used together with step-down transformers.
Using Slam®Hornet -unit with transformers of 2-pole socket outlets (without earthing /
bonding) imposes certain extra requirements for the unit itself. All the external metal and
aluminium parts of the Slam®Hornet are replaced by the manufacturer with plastic parts or
equipped with plastic covers in order to avoid electrostatic charging and a consequent risk of
explosion. This process can only be done by manufacturer because the certification of the
product.
Please inform us about your requirement for 2-pole use when placing the order. Products
originally manufactured for 3-pole use can not be modified later for 2-pole use by the operator.
Such modifications are only allowed to be carried out by the manufacturer or under
supervision of the manufacturer.
Note! Lack of equipotential bonding may cause danger in Ex
–area, therefore please pay
special attention to all installations of yours involving metallic parts. Static charging is
especially noted on standards referring to installations in explosion hazardous areas (e.g.
EN/IEC 60079-14).