background image

www.atestgaz.pl

depress the TEST button for about five seconds (the TEST indicator should go on afterwards),
make sure that the controlled valve is closed, 
reopen the valve. 

In any irregularities are found out in the procedure of the valve closing please contact the manufacturer or
a service company.

When the controller reports the valve failure (see Table 5) or low voltage of the controller

battery (see Table 4) execution of the test is disabled.

7.5.2

Replacement of consumables and fast wearing parts

Lifetime of consumables and fast wearing parts is listed in Table 9.
7.5.2.1 Replacement of battery
To replace the controller battery follow the procedure below:

disconnect the controller from power voltage, 
remove the lid, 
disconnect the battery, 
replace the battery with a new one, 
repeat the disassembling procedure in the reverse order.

7.5.3

Maintenance

Except cleaning the external part of the enclosure, the device does not require any maintenance. The
external part of the enclosure should be cleaned by means of a soft cloth moistened with water and a bit of

a mild detergent.

7.6

Utilization

This symbol on a product or on its packaging indicates that the product
must not be disposed of with other household waste. Instead, it is the

user's responsibility to ensure disposal of waste equipment by handing it
over to a designated collection point for the recycling of waste electrical

and electronic equipment. The proper recycling of your waste equipment
at the time of disposal will help to conserve natural resources and ensure

that   it   is   recycled   in   a   manner   that   protects   human   health   and   the
environment. Information about relevant designated collection points can

be obtained from the Local Authority, waste disposal companies and in the
place   of   purchase.   The   equipment   can   also   be   returned   to   the

manufacturer.

s. 13|15

User Manual: POD-067-ENG R01

Summary of Contents for Control V

Page 1: ...POD 067 ENG R01 User Manual Valve Controller Control V Product code PW 121 X...

Page 2: ...ring Detection and Reduction of gas hazards We invite you to familiarize yourself with our offer on www atestgaz pl Atest Gaz A M Pachole sp j ul Spokojna 3 44 109 Gliwice Poland tel 48 32 238 87 94 f...

Page 3: ...nts during the entire lifetime of the product Use of unauthorized spare parts different from the ones listed in Table 9 is strictly forbidden How to use this manual The following symbols of optical in...

Page 4: ...ce status 8 Table 4 Meaning of LED indicators in the battery status 8 Table 5 Meaning of LED indicators in the valve status 9 Table 6 Description of TEST button 9 Table 7 Selection of cables for conne...

Page 5: ...f the controller is subjected to continuous monitoring of its operability and its key parameters where such items as continuity of the line for valve control its resistance charging status of the embe...

Page 6: ...roper way Before painting the floors make sure the device is secured 3 Description of the construction Product code Dimensions mm A B C D E PW 121 L X 125 110 125 110 75 PW 121 H X 175 160 125 110 100...

Page 7: ...2 Electric interface description 4 1 1 Power supply port for a valve to be controlled The output port designed to supply a shutoff valve The port is monitored resistance of the output line is continuo...

Page 8: ...igital communication with other devices of the Teta series PLN Power Line Networking 5 User interface Figure 4 Front panel 5 1 Device status Indicator Status colour Information green Regular operation...

Page 9: ...ection 7 5 1 Indicator Status colour Information No need to test the valve green Slow blinking of the LED indicator test of the valve is needed see details in Section 7 5 1 green Test of the valve is...

Page 10: ...ll with cable glands downwards where the mounting position is shown in 2 The location of the device should be easily accessible to operating personnel but access of unauthorized persons should be rest...

Page 11: ...f cable cores mm2 Cross section of a cable parallel connection of cores mm2 Maximum length of the cable for valves with power 72 W m Maximum length of the cable for valves with power 36 W m 1 5 2x1 0...

Page 12: ...ted to the controller On the contrary moving the switch to the OFF position makes the controller to close the shutoff valve connected to the valve port when the contacts of the DI port are shorted see...

Page 13: ...e order 7 5 3 Maintenance Except cleaning the external part of the enclosure the device does not require any maintenance The external part of the enclosure should be cleaned by means of a soft cloth m...

Page 14: ...ial free contact Inactive for resistance below 10 Active for resistance above 3300 Minimum duration of the switchover pulse 1s Digital communication parameters Teta BUS port Communication protocol Tet...

Page 15: ...ry 12 V 5 Ah 1 year MW Power MW 5 12 Table 9 List of consumables 10 Product marking Control V Valve Controller PW 121 Valve type L Coil resistance 4 power consumption 36 W H Coil resistance 2 power co...

Page 16: ...certain voltage limits EN 60335 1 2012 in relation to directive 2011 65 EU on the restriction of the use of certain hazardous substances in electrical and electronic equipment EN 50581 2012 other EN 6...

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Reviews: