Chapter 1. Introduction
13
Port and LED Panel
No.
Item
Description
1
Status, ID
and
Selected
LEDs
Power: Lights when the unit is powered up and ready to
operate.
PDU/Phase / Bank / IP – see ID DIsplay Section, below.
Sensor 1 / Sensor 2 / Reset
1
ID Display
Section
The ID of the selected PDU/Phase / Bank / IP appears in the
LED display window.
When the PDU/Phase LED is lit, use the Up and Down
buttons to move forward or backward through the following
sequence: 01
→
b1
→
b2
→
01
(Station
→
Bank1
→
Bank2
→
Station)
When the Outlet LED is lit, use the Up and Down buttons to
move forward or backward through the outlets: 01
→
02
→
03
→
... 01 (Outlet1
→
Outlet2
→
Outlet3
→
... Outlet1)
In a daisy chain installation, hold down both the Up and Down
buttons for three seconds simultaneously to toggle between
Station and Outlets.
2
Readout
Section
When Station / Bank / Outlet is selected, readouts for Current,
Voltage and Power Dissipation appear in the display window.
Press the button next to the LED display window to cycle the
selection between the items; the LEDs next to the items
indicate which one the display relates to.
When a sensor is selected, the display shows temperature /
humidity / differential pressure according to the sensor type
1
3
5
2
7
LAN
SENSOR
1
2
SELECT
POWER
PDU
/ PHASE
BANK
IP
SENSOR 1
SENSOR 2
RESET
4
6
Summary of Contents for PE7216r
Page 32: ...eco PDU PE Series User Manual 22 This Page Intentionally Left Blank ...
Page 40: ...eco PDU PE Series User Manual 30 This Page Intentionally Left Blank ...
Page 92: ...eco PDU PE Series User Manual 82 This Page Intentionally Left Blank ...
Page 96: ...eco PDU PE Series User Manual 86 This Page Intentionally Left Blank ...